Loading...
Freeport NIP(2.2)-LR010806WATER INJECTION OBSERVATION Date of Service: Client No.: Client: 08/06/01 3053 TNA North American, Inc. 1321 Valwood Parkway, Suite 440 Carrollton, TX 75006 Report No.: Project No.: Project: 94011204.00010 94011204 Sales Office&Warehouse Fac. Coppell, Texas Location: Building Pad General Contractor: Pacific Builders Injector: Kinley Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 3rd No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X ln,iection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Iniection to refusal at each location. X Comments: Technician: D. RogersFF. Smith Report Distribution: (1) TNA Nortg American, lnc (1) Can'ell Poole & Yost Architecture (1) R. L. Goodson Consulting Engineers ( 1 ) Pacific Builders ( 1 ) FACServices, Inc. (1) David Kent (1) City of Coppell Bldg. lnsp. (I) City of Coppell Constr. lnsp. ng, Inc. Eric J. Cleveland, P. E. Senior Project Engineer 99ss This repod is exclusively for the use o! the client indicated above and shall not be reproduced in full without written approval of HBC Engineer