Loading...
Freeport NIP(2.2)-LR010804WATER INJECTION OBSERVATION Da[[~. Texa~ 75247 Date of Service: Client No.: Client: 08/04/01 3053 TNA North American, Inc. 1321 Valwood Parkway, Suite 440 Carrollton, TX 75006 Report No.: Project No.: Project: 94011204.0009 94011204 Sales Office&Warehouse Fac. Coppell, Texas Location: Building Pad General Contractor: Pacific Builders Injector: Kinley Procedure: On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 3rd No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X lniection to refusal at each location. X Comments: Technician: D. Boyd/T. Smith Report Distribution: (I) mA North American, Inc. (1) Carrell Poole & Yost Architecture (1) R L. Goodson Consulting Engineers (1) Pacific Builders (I) FACServices, Inc. (1) David Kent (1) City of Coppcll Bldg. insp. (1) City of Coppell - Constr. Insp. ring, Inc. Eric J. Cleveland, P. E. Senior Project Engineer 99ss This repor~ is exclusively for the use of the client indicated above and shall not be reproduced in tull without written approval of HBC Engineer