Freeport NIP(2.2)-LR010804WATER INJECTION OBSERVATION
Da[[~. Texa~ 75247
Date of Service:
Client No.:
Client:
08/04/01
3053
TNA North American, Inc.
1321 Valwood Parkway, Suite 440
Carrollton, TX 75006
Report No.:
Project No.:
Project:
94011204.0009
94011204
Sales Office&Warehouse Fac.
Coppell, Texas
Location:
Building Pad
General Contractor: Pacific Builders
Injector: Kinley
Procedure:
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 3rd No. of Probes: 4 Probe Length: 12 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
lniection to refusal at each location. X
Comments:
Technician: D. Boyd/T. Smith
Report Distribution:
(I) mA North American, Inc.
(1) Carrell Poole & Yost Architecture
(1) R L. Goodson Consulting Engineers
(1) Pacific Builders
(I) FACServices, Inc.
(1) David Kent
(1) City of Coppcll Bldg. insp.
(1) City of Coppell - Constr. Insp.
ring,
Inc.
Eric J. Cleveland, P. E.
Senior Project Engineer
99ss This repor~ is exclusively for the use of the client indicated above and shall not be reproduced in tull without written approval of HBC Engineer