Freeport NIP(2.2)-LR010802WATER INJECTION OBSERVATION
Date of Service:
Client No.:
Client:
08/02/01
3053
TNA North American, Inc.
1321 Valwood Parkway, Suite 440
Carrollton, TX 75006
Report No.:
Project No.:
Project:
94011204.0007
94011204
Sales Office &Warehouse Fac.
Coppell, Texas
Location:
Building Pad
General Contractor: Pacific Builders
Injector: Kinley
Procedure:
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 2nd No. of Probes: 4 Probe Length: 12 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
Iniection to refusal at each location. X
Comments:
Technician: D. BoydFF. Smith
Report Distribution:
(1) TN A North American, lnc
(1) Carrell Poole & Yost Architecture
(I) R. L. Goodson Consulting Engineers
(1) Pacific Builders
(1) FACServices, Inc
(1) David Kent
(1) City of Coppell - BIdg lnsp.
(1) City of Coppell - Constr. Insp.
Eric J. Cleveland, P. E.
Senior Project Engineer
99ss This repod is exctusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer