Freeport NIP(2.2)-LR010801WATER INJECTION OBSERVATION
Date of Service:
Client No.:
Client:
Location:
Procedure:
08/01/01
3053
TNA North American, Inc.
1321 Valwood Parkway, Suite 440
Carrollton, TX 75006
Report No.:
Project No.:
Project:
94011204.0006
94011204
Sales Office &W~ehouse Fac.
Coppell, Texas
Building Pad
General Contractor: Pacific Builders
Injector: Kinley
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 2nd No. of Probes: 4 Probe Length: 12 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
In.jection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacinl~ of injection was 5 feet maximum. X
Iniection to refusal at each location. X
Comments:
Technician: D. Boyd/T. Smith
Report Distribution:
(l) TNA North American, Inc.
(1) Carrell P{~le & Yost Architecture
(1) R. L. Goodson Consulting Engineers
(1) Pacific I~;uildcrs
( 1 ) FACServices, Inc.
(1) David Kent
(I) City of Coppell - Bldg lnsp.
(1) City of Coppcll Constr. Insp
Eric J. Cleveland, P. E.
Senior Project Engineer
99ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer