Loading...
Freeport NIP(2.2)-LR010801WATER INJECTION OBSERVATION Date of Service: Client No.: Client: Location: Procedure: 08/01/01 3053 TNA North American, Inc. 1321 Valwood Parkway, Suite 440 Carrollton, TX 75006 Report No.: Project No.: Project: 94011204.0006 94011204 Sales Office &W~ehouse Fac. Coppell, Texas Building Pad General Contractor: Pacific Builders Injector: Kinley On this date, a representative of HBC Engineering, Inc. observed the injection of water at this site. During the injection process, the following observations were recorded. Pass No.: 2nd No. of Probes: 4 Probe Length: 12 feet OBSERVATION SPECIFICATION Yes No N/A Surfactant added to each load. X In.jection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacinl~ of injection was 5 feet maximum. X Iniection to refusal at each location. X Comments: Technician: D. Boyd/T. Smith Report Distribution: (l) TNA North American, Inc. (1) Carrell P{~le & Yost Architecture (1) R. L. Goodson Consulting Engineers (1) Pacific I~;uildcrs ( 1 ) FACServices, Inc. (1) David Kent (I) City of Coppell - Bldg lnsp. (1) City of Coppcll Constr. Insp Eric J. Cleveland, P. E. Senior Project Engineer 99ss This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineer