Freeport NIP(2.2)-LR010731WATER INJECTION OBSERVATION
Date of Service:
Client No.:
Client:
07/31/01
3053
TNA North American, Inc.
1321 Valwood Parkway, Suite 440
Carrollton, TX 75006
Report No.:
Project No.:
Project:
94011204.0005
94011204
Sales Office &Warehouse Fac.
Coppell, Texas
Location:
Building Pad
General Contractor: Pacific Builders
Injector: Kinley
Procedure:
On this date, a representative of HBC Engineering, Inc. observed the injection of water at this
site. During the injection process, the following observations were recorded.
Pass No.: 1st No. of Probes: 4 Probe Length: 12 feet
OBSERVATION
SPECIFICATION Yes No N/A
Surfactant added to each load. X
Iniection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
Injection to refusal at each location. X
Comments:
Technician: D. Boyd/T. Smith
Report Distribution:
(1) TNA North American, h~c
(1) Carrell Poole & Yost Architecture
(1) R. L. Goodson Consulting Engineers
(1) Pacific Builders
(1) FACServices, [nc
(1) David Kent
(1) City of Coppell - Bldg. lnsp.
(I) City of Coppell - Constr. [nsp.
Eric J. Cleveland, P. E.
Senior Project Engineer