Loading...
Magnolia Rest-CS040109T H E · C I T Y . 0 F COl'FELL January 9, 2004 Dean Preston Purple Mountain Construction Services, Inc~ 4712 Memphis Street Dallas TX 75207 fax 214/905-3863 RE: Magnolia Restaurant Addition, Deliman's Grille Final Acceptance Conditions Dear Mr. Preston: On January 2, 2004 you were notified to provide a cashiers check of $5,000 which will be accepted in lieu of a surety maintenance bond for the referenced project. The City of Coppell has not received the check and I will be unable to sign off on the Certificate of Occupancy until the following items are completed: 1. Replace six-foot section of curb along Denton Tap Rd. noted in recent site visit (your repair to this area was done improperly). 2. Provide a cashier's check for $5,000 as a bond for the 2-year maintenance period. 3~ Provide Verlin Adams of Adams Engineering the as-built changes for record drawings to be submitted to City of Coppell Engineering Dept. When these three items are complete I will sign off on the CO and send a final acceptance letter. If you have any questions, please call me at 972/304-3679. Sincerely, Rick O'Dell Construction Inspector Office Phone: 972/304-7090 Fax: 972/304-3570 CC: Kenneth M. Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Vernon Gilmore, Acting Fire Marshal Finance Department