Prestwick-LR010905· GEOTECHNICAL ENGINEERING
E . ENVIRONMENTAL CONSULTING GEE Consultants, Inc.
[]· CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972
REPORT OF CONCRETE MIX OBSERVATION
Report Date: September 5, 2001 Date Concrete Placed: August 6, 2001 Standard 6"x12"
Client: B.A.V. Development, Inc. Area 28.27 Square Inches
Project: Prestwick Court Concrete Report No.: 2
Contractor: H & M Utilities Project No.: 200-0361
Concrete Supplier anti Plant: Lattimore Materials ,97
Location of Placement: Inlets
MATERIALS s~ sso a~ w~. OBSERVATION DATA
Mix Number: 44 Time Sample Batched:
Cement: Time Sampled:
Sample Location:
Fly Ash: Truck/Ticket No:
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 97°F
Concrete Range: 96°F
Fine Aggregate: Slump Range (inches): 2t/2'
Achnixtores: Weather Conditions: Partly Cloudy
i 0Time Started: 02:00 pm
2 Time Completed: 05:00 pm
Atitied Water: 10 gallons Sample Air Content (%): 2%
Total Cubic Yards Placed: 6.5
02:48 pm
03:26 pm
Stonewick Ln. - Station 4+30
1125/7106056
Requi~ ffi Strength (Lbs./sq.in.): 4,000
PRE 5 4 08/10/01 137,460 4,860
29 09/04/01 157,720 5,580
PRE 6 21/z ,,
PRE 7 29 09/04/01 156,440 5,530
PRE 8 H HOLD
Methed~ Utiliz~ Fracture Reda' Cylinders Made By: AS
Remarks and/or Distribution:
CCi
Mr. Bob Delsanter - B.A.V. Development, Inc.
Mr. Rodney Louviere - Dowdey Anderson & Associates, Inc.
Mr. Larry Davis - City of Coppell
Mr. Robert Hodges - Angelo Iaffate Construction, L.L.C.
Mr. Royce Carter - H&W Utility Contractor
Reviewed by:
· GEOTECHNICAL ENGINEERING
· ENVIRONMENTAL CONSULTING
GEE Consultants, Inc.
E [~ oCONSTRUCTIONMATERIALSTEST[NG
10046 Monroe Drive · Dallas, Texas 75229 · (21 4) 352-5433 Fax (214) 352-6972
REPORT OF CONCRETE MIX OBSERVATION
Report Date: September 5, 2001 Date Concrete Placed: August 7, 200I Standard 6"x12"
Client: B.A.V. Development, Inc. Area 28.27 Square Inches
Project: Prestwick Court Concrete Report No.: 3
Contractor: H & M Utilities Project No.: 200-0361
Concrete Supplier and Plant: Lattimore Materials #7
Location of Placement: Inlets
MATERIALS so~,~ ssD Ba~ w~. OBSERVATION DATA
Mix Number: 44 Time Sample Bamhed: 03:45 pm
Time Sampled: 04:30 pm
Cement: Sample Location: North end of project
Fly Ash: Track/Ticket No: 757/7106160
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 95°F
Fine Aggregate: Concrete Range: 109°F *
Slump Range (inches): 0"
Admixtures: Weather Conditions: Cloudy
l 0Time Started: 02:30 pm
2 Time Completed: 06:00 pm
Added Water: 45 gallons before sample; unknown atler Sample Air Content (%): N/A
Total Cubic Yards Placed: 6
Requit Stren,gth (Lbs./sq.in.): 4,000
PRE 9 3 08/10/01 73.860 2,610
PRE 12 8 08/15/01 100,940 3,570
PRE 10 28 09/04/01 104,100 3,680
PRE 11 28 09/04/01 113,000 4,000
're,t M~mom U~i~ rtam~ ~.~,~u Cylinders Made By: RE
ASTM C-31 ,C-39,C-143 /Unless Not~t Otherwise)
Remarks an~/or Distribution: * Superintendent w/H&W Utility notified of temperature
· * Superintendent & City inspector wlH&W Utility notified of slmnp
cc: Mr. Bob Delsanter - B.A.V. Development, Inc.
Mr. Rodney Louviere - Dowdey Anderson & Associates, Inc.
Mr. Larry Davis - City of Coppetl
Mr. Robert Hodges - Angelo Iafrate Construction, L.L.C.
Mr. Royce Carter - .&W Utility Contractor