Loading...
Prestwick-LR010905· GEOTECHNICAL ENGINEERING E . ENVIRONMENTAL CONSULTING GEE Consultants, Inc. []· CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION Report Date: September 5, 2001 Date Concrete Placed: August 6, 2001 Standard 6"x12" Client: B.A.V. Development, Inc. Area 28.27 Square Inches Project: Prestwick Court Concrete Report No.: 2 Contractor: H & M Utilities Project No.: 200-0361 Concrete Supplier anti Plant: Lattimore Materials ,97 Location of Placement: Inlets MATERIALS s~ sso a~ w~. OBSERVATION DATA Mix Number: 44 Time Sample Batched: Cement: Time Sampled: Sample Location: Fly Ash: Truck/Ticket No: Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 97°F Concrete Range: 96°F Fine Aggregate: Slump Range (inches): 2t/2' Achnixtores: Weather Conditions: Partly Cloudy i 0Time Started: 02:00 pm 2 Time Completed: 05:00 pm Atitied Water: 10 gallons Sample Air Content (%): 2% Total Cubic Yards Placed: 6.5 02:48 pm 03:26 pm Stonewick Ln. - Station 4+30 1125/7106056 Requi~ ffi Strength (Lbs./sq.in.): 4,000 PRE 5 4 08/10/01 137,460 4,860 29 09/04/01 157,720 5,580 PRE 6 21/z ,, PRE 7 29 09/04/01 156,440 5,530 PRE 8 H HOLD Methed~ Utiliz~ Fracture Reda' Cylinders Made By: AS Remarks and/or Distribution: CCi Mr. Bob Delsanter - B.A.V. Development, Inc. Mr. Rodney Louviere - Dowdey Anderson & Associates, Inc. Mr. Larry Davis - City of Coppell Mr. Robert Hodges - Angelo Iaffate Construction, L.L.C. Mr. Royce Carter - H&W Utility Contractor Reviewed by: · GEOTECHNICAL ENGINEERING · ENVIRONMENTAL CONSULTING GEE Consultants, Inc. E [~ oCONSTRUCTIONMATERIALSTEST[NG 10046 Monroe Drive · Dallas, Texas 75229 · (21 4) 352-5433 Fax (214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION Report Date: September 5, 2001 Date Concrete Placed: August 7, 200I Standard 6"x12" Client: B.A.V. Development, Inc. Area 28.27 Square Inches Project: Prestwick Court Concrete Report No.: 3 Contractor: H & M Utilities Project No.: 200-0361 Concrete Supplier and Plant: Lattimore Materials #7 Location of Placement: Inlets MATERIALS so~,~ ssD Ba~ w~. OBSERVATION DATA Mix Number: 44 Time Sample Bamhed: 03:45 pm Time Sampled: 04:30 pm Cement: Sample Location: North end of project Fly Ash: Track/Ticket No: 757/7106160 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 95°F Fine Aggregate: Concrete Range: 109°F * Slump Range (inches): 0" Admixtures: Weather Conditions: Cloudy l 0Time Started: 02:30 pm 2 Time Completed: 06:00 pm Added Water: 45 gallons before sample; unknown atler Sample Air Content (%): N/A Total Cubic Yards Placed: 6 Requit Stren,gth (Lbs./sq.in.): 4,000 PRE 9 3 08/10/01 73.860 2,610 PRE 12 8 08/15/01 100,940 3,570 PRE 10 28 09/04/01 104,100 3,680 PRE 11 28 09/04/01 113,000 4,000 're,t M~mom U~i~ rtam~ ~.~,~u Cylinders Made By: RE ASTM C-31 ,C-39,C-143 /Unless Not~t Otherwise) Remarks an~/or Distribution: * Superintendent w/H&W Utility notified of temperature · * Superintendent & City inspector wlH&W Utility notified of slmnp cc: Mr. Bob Delsanter - B.A.V. Development, Inc. Mr. Rodney Louviere - Dowdey Anderson & Associates, Inc. Mr. Larry Davis - City of Coppetl Mr. Robert Hodges - Angelo Iafrate Construction, L.L.C. Mr. Royce Carter - .&W Utility Contractor