ST9502-CN 960523PROJECT: CONTRACTOR: OWNER: CHANGE ORDER NO.: CITY OF COPPELL CHANGE OR EXTRA WORK ORDER Item # Town Center Drive & Town Center Blvd. / ST 95-02 Site Concrete, Inc City of Coppell 2 DATE: May 23, 1996 CHANGE OR EXTRA WORK TO BE DONE Description Quantity Unit Unit Price Total ADD: 1 4" Bore for 27 LF 8.00 Sprinkler System $216.00 Total Revision to Contract Amount $216.00 Previous contract amount Net increase in contract amount Revised contract amount Net increase in contract time of completion Revised Contract time of completion $ 447,156.75 216.00 $447,372.75 N/A N/A The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract. Re~Znd~~~ity Engineer: Agreed to by the Contractor: Date: Accep~~the Owner: D ate: Date: SITE CONCRETE. ,,,C. P.O. BOX 140096 IRVING, TEXAS 75014-0096 PH. 214-313-0733 FAX 214-513-0825 ADDITIONAL WORK AUTHORIZATION OWNER'S NAME City of Coppell C/O Larry Davis STREET 255 Parkway Boulevard CITY SFATE Coppell TX 75019 : E 96-16 PHONE 304-3684 JOB NAME To~m STREET T o xcn Coppell Center Dr. Center Dr. JOB NUMBER & Blvd. 96-16 & Blvd. STAT~X You are hereby authorized to perform the following specifically described additional work.- 1. AP2ROX. 27 LF 4" Bore for Sprinkler System i @ $8.00/LF= $216.00 ADDITIONAL CHARGE FOR ABOVE WORK IS: $ 216. oo Payment to be made as follow.~.' .~.S per original agree__m__en___t__.___ Above additional work to be performed under same conditions as ~pecifl'ed in origina; contract unless otherwise stipulated. Date 19 Authorizing Signature We hereby agree to furnish/abor and materials-complete In acc~e with the above specifications, at above stated price NO= /CQN~ACTQ SIGN NOTE: This Revision Dec~5 part of, and in conf~mance '~]th, ihe exis~n 031511 (OWNEe SIGNS HERE) Date _ 5-22 19