Loading...
Prestwick-LR010713C]I · GEOTECHNICALENGINEERING E · ENVIRONMENTAL CONSULTING GEE Consultants, Inc.  · CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 MOISTURE DENSITY RELATIONSHIP REPORT Test Report Date: Client: Sample Date: Project: Identification: Test Procedure: July 13, 2001 B.A.V. Development, Inc. July 10, 2001 Prestwick Court Moisture Density Relationship ASTM D698 Project No: 200-0361 Moisture Report No. 7 Test Results: Method ......................................... A Optimum Moisture Content ........................... 20.8 percent Maximum Density ................................. 99.4 pounds per cubic foot Rammer Type ..................................... Manual Material Description ................................ Dark Brown & Brown Clay Mae. rial Origin .................................... Station 0+00, 8" sanitary sewer Moisture Preparation Procedure ......................... Air Dry Liquid Limit ..................................... 50 Plastic Limit ..................................... 19 Plasticity Index ................................... 31 Percent Passing No. 200 U.S. Sieve ...................... 87 Technician: AT Mr. Bob Delsanter - B.A.V. Development, Inc. Mr. Rodney Louviere - Dowdey Anderson & Associates, Inc. Mr. Larry Davis - City of Coppell Mr. Robert Hodges - Angelo Iafrate Construction, L.L.C. Mr. Royce Carter - H&W Utility Contractor apply only m the sample tested and/or observed, and are not necessarily indicative of the quanmies of apparently identical or similar products. GEOTECHNICAL ENGINEERING · ENV[RONMENTALCONSULTING GEE Consultants, Inc. CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. I 1 (200-0361) Method: ASTM D2922 D3017 D698 Page 1 or' I Client: B.A.V. Development, Inc. Material Description Maximum Optimum Dry Moisture Density Content Project: Prestwick Court (Lbs/CuFt) Percent 1. Yellowish Brown Sandy Clay w/olive gray & occasional Test Date: July 12, 2001 limestone Ilia 14.0 2. Light Gray Limestone w/gray sandy clay 106.5 15.7 3, Light Gray & Yellowish Brown Sandy Clay 110.5 14.0 Report Date: July 13, 2001 4. Gray Sandy Clay w/tan weathered limestone fragment~ 103.3 18.0 5. Brown Silty Clay 98.3 20.2 6. Brown Clayey Sand 116.2 11.6 Required Density (%): 95% - 105% 'L Dark Brown & Brown Clay 99.4 20.8 Required Moisture (%): Opt +5% (Clay); Opt. _+ 3%(Sand) Mat Locatio~'Elevation (and/or) Lift In-Place In-Place Percent No. Dry Density Moisture Compactmn Test No. (Lbs/CuFt) Content (%) Probe Dept 4 Line A - Station 1+95, 3' BEG 29 107.5 1.8.2 104.1 4 Line A - Station 1 + 90, 6" BEG 30 104.9 19.4 101.6 4 4" Line A - service lateral for Lot 3, Block B, 3' BEG 31 103.3 19.1 i00.1 4 4" Line A - lateral for Lot 3, Block B, 1' BEG 32 105.7 18.3 102.4 Test results meet project specifications cc: Mr. Bob Delsanter - B.A.V. Development, Inc. Mr. Rodney Louviere - Dowdey Anderson & Associates, Inc. Mr. Larry Davis - City of Coppell Mr. Robert Hodges - Angelo Iafrate Construction, L.L.C. Mr. Royce Carter - H&W Utility Contractor