Loading...
ST9801-CS010116 ~72 ~04 ~547 01/16/81 14:23 CITY OF COPPELL ~ CITY OF COPPELL N0.219 ~01 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS 'lo: RE; Larry Davis, Construction Inspector Englueerlng Larry Morton, Sign/Si~pml/Streets Division Public Works January 16, 2001 Follow-up Walk-thru Coppell Rd. Project item 2-Cut out & repair bad spots in asphalt marked with white paint NOT DONE. Item 5-Level up valve stacks and the boxed out m~ea at them NOT DONE. Item 7-Replace missing 30mph signs halfway between F~stwick & Minyard on both sides of Coppell Rd. NOT DONE. Item 19-Install Right Turn Only (30" X 36") si~ for Parkway NOT DONE. CITY OF COPPF.,I,L PLrBLI¢ Ib'ORK$ DF, PARTM;KNT