Loading...
ST9502-CN 960506SITE CONCRETE, INC. 3328 Roy Orr · Grand Prairie, TX 75050-4207 · 214-313-0733 ° FAX 214-513-0825 Mailing Address: P. O. Box 140096 · Irving, Texas 75014-0096 May 6, 1996 Mr. Ken Griffin, P.E. City of Coppell 255 Parkway Blvd. Coppell, TX 75019 Re: Town Center Drive & Boulevard Coppell, Texas Job #96-16 Dear Mr. Griffin: Please find attached revised change order number 3 for the above referenced project. It has been revised to reflect the items discussed at our meeting on Monday, April 22, 1996. Items 1-6, the deletions, remain as shown on the original change order. The additions to the contract, items 7-11 of the original change order have been revised as follows: Item 7 remains unchanged from original change order. Item 8 has been reduced in price. Item 9 (Median Brick Pavers) has been deleted. Item 10 has been reduced in price. Item 11 remains unchanged. We are still requesting 5 additional working days be added to our contract. Per your request, we have mapped the pond with regards to existing water and silt levels. After mapping the pond and considering various options to reduce the water level and isolate the existing headwall for connection, we believe this task can best be achieved by constructing a temporary earth cofferdam. This cofferdam will be constructed as near to the outfall of the exiting headwall as is reasonable to allow for work space. Due to this construction, we are anticipating a need to repair and/or replace some existing landscape features. These may also include repairs to existing underground sprinkler system in the area. We will take measures to minimize any damage to these features while also performing the work in a manner to provide the shortest possible disruption to the homeowners and the pond itself. Mr. Ken Griffin, P.E. May 6, 1996 Page 2 of 2 A breakdown of the costs associated with item no. 8 has been included, as requested. A copy of the sketch showing the existing water and silt levels in the pond has been enclosed as requested. Please do not hesitate to contact me if you have any questions or comments. Sincerely, SITE CONCRETE, INC. Steven G. Shanks Director of Projects SGS/dh enclosures TOWN CENTER DRIVE AND TOWN CENTER BOULEVARD COPPELL, TEXAS CHANGE ORDER ~3 (Revised 5-6-96) DELETIONS 1. APPROX. 24.00 SY 2. APPROX. 1.00 EA 3. APPROX. 96.00 LF 4. APPROX. 196.00 LF 5. APPROX. 1.00 EA 6. APPROX. 1.00 EA Remove & Replace Pvmt. for 8" Watedin 8" X 16" Tapping Sleeve 18" Storm Drain 24" Storm Drain 10' Curb Inlet Standard 2-Grate Inlet ($65.00)/SY= ($1,295.00)/EA= ($40.00)/LF= ($45.00)/LF= ($2,250.00) lEA= ($1,750.00)/EA= Total Deleljons ADDITIONS 7. APPROX. 1.00 LS 8? APPROX. 1.00 LS 9. DELETED 10. APPROX. 1.00 EA 11. APPROX. 1.00 LS Relocate 80 LF of 8" Water & Tie-In Provide Labor & Equipment to Drain/Refill Exis~ng Pond 6' Stubout of 24" C1 IV RCP Re-stock & Misc. Cost for Deleted Items $2,000.00/LS= $10,150.00/LS= $350.00 lEA= $3,165.00/LS= Total Addifions Grand Total Request 5 addil~onal working days for connecfion to exjsl~ng box culvert and to drain and refill pond. City of Coppell and/or Homeowners Associafion to provide water to refill pond. IF REQUIRED OPTION A: If so directed, we could install 18" C1 N RCP & 24" C1 N RCP in lieu of the deleted 18" & 24" ADS storm drain pipe for an additional $4.00 & $7.00 (respectively) added to our existing unit price bid. *BREAKDOWN OF ADDITION ITEM NO. 8 VEHICLES/EQUIPMENT 400 PCI IT 28 Trucks 25 Hours @ $125.00/Hour 25 Hours @ $45,00/Hour 25 Hours @ $35.00/Hour $3,125.00 $1,125.00 $875.00 MISCELLANEOUS 120 Manhours to Handgrade & Keep Water From Work Area Pump Existing Pond to Lower Water Level 2 Feet Restoration of Exjsfing Landscape Feature $1,800.00 $1,475.00 $1,750.00 ($1,560.00) ($1,295.00) ($3,840.00) ($8,820.00) ($2,25o.oo) ($1,75o.oo) ($19,515.oo) $2,000.00 $10,150.00 $350.00 $3,165.00 $15,665.00 ($3,850.00) Total Item No. 8 $10,150.00 SITE CONCRETE, .,C. P.O. BOX 140096 IRVING, TEXAS 75014-0096 PH. 214-313-0733 FAX 214-513-0825 ADDITIONAL WORK AUTHORIZATION OWNER'S NAME PHONE DAT% City of Coppell C/O Kenneth Griffin, P.E. 304-3684 -6-96 STREET JOB NAME 255 Parkway Boulevard Town Center Dr. & Blvd. Ci T V S FA rET X S TREE r Coppell 75019 Town Center Dr. & Blvd. E : ~; ~G ~; EXISTING CO/V rRACT NO, DAT ,.30Z ~:~lCONTRACT CITY S 96-1.6 Coppoll You are hereby authonzed to perform lhe following s~c.ctlicatly described additional work: Please see attached. REDUCTION Payment to be made as follows.' 3,850.00) Above additional w c, tk to be performed under same conditions as specified in original contract unless otherwise stipulated. Date ............... 19 Authorizing Signature ...... We hereby agree to furnish labor and rnatertals-ct~mplele tn accordance with the above specifications, at above slated price. THIS IS CHANGE ORDER NO ..... 3_.__(_Revised 5-6-96) NOTE,' This Revision becomes part ol, and in confolmance with, t~e ex,~t~ng contract 031511 .... T ...... 'T ......................................................... ]i rElylINER SIGNS HERE) Date 5-6-96 ~9~_