Loading...
First Methodist-LR011127Construction Materials Testing and Environmental Consulting 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: November 27. 2001 Date Concrete Placed: November 14, 2001 Standard 6 Client: First United Methodist Church Coppell Area 2827 Square Inches Project: First United Methodist Church New Parking Lot Concrete Report No.: 18 Contractor: Hill Wilkinson Ltd. Project No.: 201 -0177 Concrete Supplier and Plant: LMC #6 Location of Placement: Pavement MATERIALS Mix Numher: Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: \dried Water: Remarks and /or Distribution: cc: Texas CMT, Inc. 38 0 gallons Source.' SSD Batch Wts Descnpuon l Lbs /CuYd) Texas CMT, Inc. Mr. John Rosenberg First United Methodist Church (2) Mr. Ray Larson First United Methodist Church Mr. Eric Royal Royal General Contractors Mr. Larry Davis City of Coppell Mr. Bob Colon Hill Wilkinson Reviewed by: OBSERVATION DATA Time Sample Batched: 06:50 am Time Sampled: 07:45 am Sample Location: 200' N. 185' W. of corner of Bethel Scho Rd. Heartz Rd. Truck /Ticket No: 1090/6164362 Temperature: Ambient Range: Concrete Range: Slump Range (inches): Weather Conditions: Time Started: Time Completed: Sample Air Content Total Cubic Yards Placed: Required Strength (Lbs. /sq.in.): 62 °F 72 °F 6/ Cloudy 06:00 am 02:30 pm 4% 30 3.000 ill !criers and reports dry ],r he exclusive use or the client o whom they arc addressed' and shall not be reproduced without he mu approval of Texas CMT. Inc. The use at our m 1 our prior xrman' approval. Our utters and reports apply only o the sample tested'.ind /or observed and are not necessarily indicative et the quantities of apparently idem iui ors similar products '.leasurce a lump 'in.i ivv D.nc Nested rout Load ILbs.l mnrcarve Slrenglh 11.b So In.; FMC 69 7 11/21/01 92,260 3,260 FMC 70 28 12/12/01 FMC 71 61/2" 28 12/12/01 FMC 72 H HOLD Test Methods Utilized Fracture Reg lar Made By: MR dSTM C- 3IC. -39.0 -143 1Jnless Noted Otherwisci Cylinders Construction Materials Testing and Environmental Consulting 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: November 27. 2001 Date Concrete Placed: November 14, 2001 Standard 6 Client: First United Methodist Church Coppell Area 2827 Square Inches Project: First United Methodist Church New Parking Lot Concrete Report No.: 18 Contractor: Hill Wilkinson Ltd. Project No.: 201 -0177 Concrete Supplier and Plant: LMC #6 Location of Placement: Pavement MATERIALS Mix Numher: Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: \dried Water: Remarks and /or Distribution: cc: Texas CMT, Inc. 38 0 gallons Source.' SSD Batch Wts Descnpuon l Lbs /CuYd) Texas CMT, Inc. Mr. John Rosenberg First United Methodist Church (2) Mr. Ray Larson First United Methodist Church Mr. Eric Royal Royal General Contractors Mr. Larry Davis City of Coppell Mr. Bob Colon Hill Wilkinson Reviewed by: OBSERVATION DATA Time Sample Batched: 06:50 am Time Sampled: 07:45 am Sample Location: 200' N. 185' W. of corner of Bethel Scho Rd. Heartz Rd. Truck /Ticket No: 1090/6164362 Temperature: Ambient Range: Concrete Range: Slump Range (inches): Weather Conditions: Time Started: Time Completed: Sample Air Content Total Cubic Yards Placed: Required Strength (Lbs. /sq.in.): 62 °F 72 °F 6/ Cloudy 06:00 am 02:30 pm 4% 30 3.000 ill !criers and reports dry ],r he exclusive use or the client o whom they arc addressed' and shall not be reproduced without he mu approval of Texas CMT. Inc. The use at our m 1 our prior xrman' approval. Our utters and reports apply only o the sample tested'.ind /or observed and are not necessarily indicative et the quantities of apparently idem iui ors similar products vunnnr desautn 'lumpLn. IDaysl U .ne Red 1otal Load LLbs.l Compressive Strength iLbszSgln_t "rt'ta x FMC 73 7 11/21/01 112,440 3,980 FMC 74 28 12/12/01 FMC 75 5 28 12/12/01 FMC 76 H HOLD rev Methods Unlined ASTM C-31.(2.-39,C 11} Fracture Reg tar (Inless Voted Olherwisel Cylinders Made By: MR Construction Materials Testing and Environmental Consulting 10044 Monroe Drive Dallas, Texas 75229 (214) 352 -6957 REPORT OF CONCRETE MIX OBSERVATION Report Date: Client: Project: Contractor: Concrete Supplier and Plant Location of Placement MATERIALS Mix Number: Cement Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine .Aggregate: Admixtures: dded Water: Remarks and /or Distribution: cc: 42 11 gallons Source Description November 27, 2001 Date Concrete Placed: November 14, 2001 First United Methodist Church Coppell First United Methodist Church New Parking Lot Hill Wilkinson Ltd. LMC #6 Pavement firelane Mr. John Rosenberg First United Methodist Church (2) Mr. Rav Larson First United Methodist Church Mr. Eric Royal Royal General Contractors Mr. Larry Davis City of Coppell Mr, Bob Colon Hill Wilkinson Texas CMT, Inc. \II letters and repons arc !or the ex clusive rise tit the diem to whom the Texas CMT, Inc. SSD Batch Wis. LbsiCuYdl Reviewed by: Fax (214) 352-6972 www .texascmt.com OBSERVATION DATA Time Sample Batched: Time Sampled: Sample Location: Truck /Ticket No: Temperature: Ambient Range: Concrete Range: Slump Range (inches): Weather Conditions: Time Started: Time Completed: Sample Air Content Total Cubic Yards Placed: Required Strength (Lbs. /sq.in.): 08:34 am 09:20 am 250' N. 160' W of corner of Bethel Scho Rd. Heartz Rd. 761/6164374 65 °F 72 °F 5" Cloudy 06:00 am 02:30 pm 2% 50 4,000 all not be reproduced without the null approval of Texas CMT, Inc. The use or our name must renew etters and reports apply only to the sxinple tesiN and /or observed and are not necessarily indicative of the quantities of apparently Identical or similar products. Standard 6 "x12" Area 28.27 Square Inches Concrete Report No.: 19 Project No.: 201 -0177 ur prior wnuen -approval. Our Vintimr 4opur.J Slump unl \ee iDaysl Awe .coed Leal Load rLbs.l Cumprc ve Strength I Lbsf,Syln.i .un arks FMC 77 7 11/21/01 82,840 2,930 FMC 78 28 12/12/01 FMC 79 5 28 12/12/01 FMC 80 H HOLD Test Methods Utilized Fracture Reg lar \STM r'at.cay.0 -i�; i unmss Noted otherwise, Cylinders Made By: MR Construction Materials Testing and Environmental Consulting 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 REPORT OF CONCRETE MIX OBSERVATION Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: MATERIALS Mix Number: Cement Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: Added Water: Remarks and /or Distribution: Cc Mr. John Rosenberg First United Methodist Church (2) Mr. Ray Larson First United Methodist Church Mr. Eric Royal Royal General Contractors Mr. Larry Davis City of Coppell Mr. Bob Colon Hill Wilkinson Texas CMT, Inc. 38 Source, Description II gallons Texas CMT, Inc. November 27, 2001 Date Concrete Placed: November 14, 2001 First United Methodist Church Coppell First United Methodist Church New Parking Lot Hill Wilkinson Ltd. LMC #6 Pavement SSD Batch W rs. tLbsiCuYd) Reviewed by: OBSERVATION DATA Time Sample Batched: Time Sampled: Sample Location: Truck /Ticket No: Temperature: Ambient Range: Concrete Range: Slump Range (inches): Weather Conditions: Time Started: Time Completed: Sample Air Content To): Total Cubic Yards Placed: Fax (214) 352 -6972 www .texascmt.com Required Strength (Lbs. /sq.in.): 3.000 \u letters and reports .n air the exclusive use or the anent to whom they are addressed and shall not be reproduced without the tun approval of Tens CMT. Inc The use of our Inters and repots apply only To the sample tested and/or observed and are not necessarily indlcaove tit the quantities or apparent/it identical or 7 v am 10:30 am 90' N. 30' W. at corner of Bethel School Rd. Heartz Rd. 805/6164382 68 °F 72 °F Cloudy 061)0 am 02:30 pm 276 120 ar prod Standard 6 "x12" Area 28.27 Square Inches Concrete Report No.: 20 Project No.: 201 -0177 our prior inen approval. Our a..,..e. aeau,ml Slump nn.i Uav°I :rate cued [Mai Load J.bsl Ornerier)) Impressive Ornerier)) Ibs. Sq_IILI i.•narks FMC 81 7 11/21/01 91,020 3,220 FMC 82 28 12/12 ;01 FMC 83 71/4" 28 12/12/01 FMC 84 1 HOLD rest Methods lliilized Fracture Re e lar a STM Gal C- 39.12-1 ,unless voted otherwise) Cylinders Made By: MR MATERIALS Mix Number: Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: Added Water: CC: Texas CMT, Inc. Construction Materials Testing and Environmental Consulting Remarks and/or Distribution: Texas CMT, Inc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352 -6957 Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: November 27, 2001 Date Concrete Placed: November 14, 2001 Standard 6 "x12" Client: First United Methodist Church Coppell Area 28.27 Square Inches Project: First United Methodist Church New Parking Lot Concrete Report No.: 21 Contractor: Hill Wilkinson Ltd. Project No.: 201 -0177 Concrete Supplier and Plant: LMC #6 Location of Placement: Pavement Source, SSD Batch Wis. [lewrlpnnn I Lbw Cu Yd) Time Sample Batched: 11:04 am Time Sampled: 11:50 am Sample Location: 100' N. 110' W. of corner of Bethel Scho Rd. Heartz Rd. Truck /Ticket No: 982/6164402 Temperature: Ambient Range: 70 °F Concrete Range: 72 °F Slump Range (inches): 7'4' Weather Conditions: Cloudy Time Started: 06:00 am 10 gallons Time Completed: 02:30 pm Sample Air Content 2 Total Cubic Yards Placed: 210 Mr. John Rosenberg First United Methodist Church (2) Mr. Ray Larson First United Methodist Church Mr. Eric Royal Royal General Contractors Mr. Larry Davis City of Coppell Mr. Bob Colon Hill Wilkinson Reviewed by: OBSERVATION DATA WI letters and reports are car Ow exclusive use of Ow client to whom Ihey are addressed and shall not be reproduced without the tull approval or Texas CMT. Inc. The use of ou r name must receive Ir pr tor carmen approval. our levers and report apply only o the sample te.md and/or observed and are not necessarily radiative or me quantities or apparently identical or similar products. oe, Mca,ured nlump i in tee iLrn hoc ia,w ml lim ,impressive drench one .Sq.In.l 1 s FMC 85 W W a N 11 /21/01 103,920 3,680 FMC 86 12/12/01 FMC 87 6 12/12/01 FMC 88 HOLD rest Methods Utilized Fracture Reg tar aSTM C- 31 .C- 39.C-143 (Unless Noted Otherwise, Cylinders Made By: MR Construction Materials Testing and Environmental Consulting 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352 -6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: Client. Protect Contractor: Concrete Supplier :Intl Plant Location of Placement MATERIALS Mix Numher: Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: tu Admixres: 1 Added Water: Remarks and /or Distribution: CC: Texas CMT, Inc. November 27, 2001 Date Concrete Placed: November 14, 2001 First United Methodist Church Coppell First United Methodist Church New Parking Lot Hill Wilkinson Ltd. LMC #6 Pavement tirelane a2 0 gallons Yonne! Ducreption Mr. John Rosenberg First United Methodist Church 2) Mr. Rav Larson First United Methodist Church Mr. Eric Royal Royal General Contractors Mr. Larry Davis City of Coppell Mr. Bob Colon Hill Wilkinson Texas CMT, Inc. SSD Bate;, Wts ILbs,Ia1 Reviewed by: OBSERVATION DATA Time Sample Batched: Time Sampled: Sample Location: Truck /Ticket No: Temperature: Ambient Range: Concrete Range: Slump Range (inches): Weather Conditions: Time Started: Time Completed: Sample Air Content (r%p): Total Cubic Yards Placed: 73 °F 75 °F 6 Cloudy 06:00 am 02:30 pm 2 %p 120 Required Stren (Lbs. /sq.in.): 4,000 [2:07 pm 12:50 pm 135' N. 95' W Rd. Heartz Rd 975/3136847 tb letters and repons ere for the exewsm° opt tit me client rn letters and reports appl plc tested and/or observed and are not necessarily Indicative of the quantities at apparently identical or similar products. Standard 6 "x12" Area 28 27 Square Inches Concrete Report No.: 22 Project No.: 201 -0177 corner of Bethel Schoo re .addressed and shall not be reproduce without the toll approval of Texas CMT. Inc. The use of our name must receive our prior wnnen approval. Our b., osr vmp..,., see .Dave t.ue ,nand Thial load .Lhs.t I btrnoressise 1Renelh lbs..Sq In loots FMC 89 7 11/23/01 107,860 3,820 FMC 90 28 12/14/01 FMC 91 6 28 12/14/01 FMC 92 H HOLD test Methods Utilized Fracture Regular 1STM C 31.C-39.C-1 3 (Unless Noted othetwlset Cylinders Made By: MR Construction Materials Testing and Environmental Consulting MATERIALS Mix Nmnller: Cement Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: ,dded Water: Remarks and /or Distribution: cC: 42 5 gallons Source! SSD Batch Wls. Dear'puon Lbs/CuYd) Mr. John Rosenberg First United Methodist Church (2) Mr. Ray Larson First United Methodist Church NIr. Eric Royal Royal General Contractors Mr. Larry Davis City of Coppell Mr. Bob Colon Hill Wilkinson Texas CMT, Inc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: November 27. 2001 Date Concrete Placed: November 16, 2001 Standard 6'x12" Client: First United Methodist Church Coppell Area 28.27 Square Inches Project First United Methodist Church New Parking Lot Concrete Report No.: 23 Contractor: Hill Wilkinson Ltd. Project No.: 201 -0177 Concrete Supplier and Plant LMC #7 Location of Placement Pavement firelane OBSERVATION DATA Time Sample Batched: 1)7 :09 am Time Sampled: 07:41) am Sample Location: L90' N. 220' W. of corner of Bethel Scho Rd. Heartz Rd. Truck/Ticket No: 956/7110884 Temperature: Ambient Range: 63 °F Concrete Range: 72 °F Slump Range (inches): 6" Weather Conditions: Cloudy Time Started: 06:00 am Time Completed: 02:30 pm Sample Air Content 2.75% Total Cubic Yards Placed: 70 Required Stren Lbs. /sq. in 4: 4, 000 'Se Texas GMT, Inc. Reviewed by: I I letters and reports .uc Ir r the exclusive use of rte client to whom they are eddresscd aM shall not be reproduced without the full approval of Texas CMT. Inc. The use or our name must receive nut prior wrinen approval. Our letters and eports apply only to the sample tested and/or observed and are not necessarily Indicative of the quantities of apparently identical or similar products. _u r. mlpt IIt Pe I" �sl.d ml Load n ,Lbsl r d mnresnve wenerh Los. S In .l ncnss FMC 93 7 11/23/01 109,860 3.890 FMC 94 28 12/14/01 FMC 95 6 28 12/14/01 FMC 96 H HOLD Test Methods Utilized Fracture Reg lac \STM C-3I- C- 39.0 -IJ1 IUnless Noted Otherwise) Cylinders Made By: MR Construction Materials Testing and Environmental Consulting VIATERIALS Mix Number Cement Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: Added hater: 12 15 gallons Source.: 'LSD Batch Wts Descnption 1I.bsiCuYdt Texas CMT, Inc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352 -6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: November 27, 2001 Date Concrete Placed: November 16, 2001 Standard 6 x12" Client: First United Methodist Church Coppell Area 28.27 Square Inches Project First United Methodist Church New Parking Lot Concrete Report No.: 24 Conn Hill Wilkinson Ltd. Project No.: 201 -0177 Concrete Supplier and Plant: LMC #7 Location of Placement: Pavement firelane OBSERVATION DATA Time Sample Batched: 08:53 am Time Sampled: 09:35 ale Sample Location: 220' N. 280' W. of corner of Bethel Scho Rd. Heartz Rd. Truck /Ticket No: 955/7110900 Temperature: Ambient Range: 70 °F Concrete Range: 75 °F Slump Range (inches): 6" Weather Conditions: Cloudy Time Started: 06:00 am Time Completed: 02:30 pm Sample Air Content 2% Total Cubic Yards Placed: 160 Required Strength (Los. /sq.in.): J (10(l Remarks and/or Distribution: cc: Mr. John Rosenberg First United Methodist Church (2) Mr. Ray Larson First United Methodist Church Mr. Eric Royal Royal General Contractors NIr. Larry Davis City of Coppell Mr. Bob Colon Hill Wilkinson Texas CMT, Inc. Reviewed by: all loiters and reports ate ror the exclusive use or the client to wham they are addressed mu shall not be reproduxed without the hill approval or Texas CMT. Inc. The use of our name must receive our prior written approval. Our lenersand tenons apply only to the sample tested andlnr observed and are not necessarily Indicative 01 the quantities of apparently identical or similar products. ',nowt \teas e. 'lump f in We 1Dnsl Luc i iced total Load I Lb,. ve Strength lb.1Sq -In.l 1nalns FMC 97 7 11 /23/01 109,980 3,890 FMC 98 28 12/14/01 FMC 99 6 28 12/14/01 FMC 100 H HOLD T v1 Methods Utilize1 Fractu re Reu tar aSTM C- 11.Ca2C -i+! I jnles .Noted Otherwise/ Cylinders Made By: MR Construction Materials Testing and Environmental Consulting 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352 -6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: November 27. 2001 Date Concrete Placed: November 16, 2001 Standard 6 °x12" Client: First United Methodist Church Coppell Area 28.27 Square Inches Project: First United Methodist Church New Parking Lot Concrete Report No.: 25 Contractor: Hill Wilkinson Ltd. Project No.: 201 -0177 Concrete Supplier and Plant: LMC #7 Location of Placement: Pavement lirelane MATERIALS Mix Number: Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: Added Water: Remarks and /or Distribution cc: Mr. John Rosenberg First United Methodist Church (2) Mr. Ray Larson First United Methodist Church Mr. Eric Royal Royal General Contractors Mr. Larry Davis City of Coppell Mr. Boh Colon Hill Wilkinson Texas CMT, Inc. 32 0 gallons nurse/ Description RI levers and reports tic for the ercluslve use nr the client m whom they +re add LSD Batch Wts 1 LbsiCu Yd) Reviewed by: Texas CMT, Inc. OBSERVATION DATA Time Sample Batched: 09:40 am Time Sampled: 10:25 am Sample Location: 310' N. 290' W. of corner of Bethel Scho Rd. Heartz Rd. Truck /Ticket No: 1039/7110906 Temperature: Ambient Range: 69 F Concrete Range: 75 °F Slump Range (inches): 0" Weather Conditions: Cloudy Time Started: 06:00 am Time Completed: 02:30 pm Sample Air Content 1.5% Total Cubic Yards Placed: 220 lull not he reproduced without the lull approval of Tools CMT. Inc. The use of our name must receive our prior writt en approval. Our Inners and retorts apply only to the sample tested vnd /or observed and are not necessarily indicative of the quantities 01 apparently identical or similar products. ',MINI Vemmcu Slump to i se I Drvsl !tee resmd he Total ad d.bs l Compressive Slrenzth t Lbs. Sy. In .1 °iej arks FMC 101 7 11/23/01 95,040 3,360 FMC 102 28 12/14/01 FMC 103 61/2 28 12/14/01 FMC 104 H HOLD rest ,Methods Utilized Fracture Reg lar eSTM C31,C -39.0 -147 (Unless Note Otherwise) Cylinders Made By: MR Construction Materials Testing and Environmental Consulting 10044 Monroe Drive Dallas, Texas 75229 (214) 352 -6957 Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: November 27, 2001 Date Concrete Placed: November 6, 2001 Standard o" s l2" Client. First United Methodist Church Coppell Area 28 -27 Square Inches Project: First United Methodist Church New Parking Lot Concrete Report No.: 26 Contractor: Hill Wilkinson Ltd. Project No.: 201 -0177 Concrete Supplier and :'lane LMC #7 Location of Placement Pavement MATERIALS Mix Number: Cement: Fly Ash: Caarse Aggregate: Intermediate Aggregate: Fine Aggregate: dn1xtures: Added Water: Remarks and /or Distribution: cc: Mr. John Rosenberg First United Methodist Church (2) Mr. Ray Larson First United Methodist Church Mr. Eric Royal Royal General Contractors Mr. Larry Davis City of Coppell Mr. Bob Colon Hill Wilkinson Texas CMT, Inc. \II letters bud reports ert m, me 38 0 gallons tient to hlioni hc s dr and shall not b epod M without the Ill approval 0 Texas GMT. Inc. The 1 our nanw nut recove rwr v d tenons tpply only o the smple estednd /or IDServed n totesaarlly indicative afley esotapparemY similar products. l identical or rVro en'pprovL Our Sources SSD Hatch W6. Description LhsCuYd) Texas CMT, Inc. Reviewed by: OBSERVATION DATA Time Sample Batched: 07:46 am Time Sampled: 08:35 am Sample Location: 200' N. 215' W. of corner of Bethel Scho Rd. Heartz Rd. Truck /Ticket No: 959/7110890 Temperature: Ambient Range: o4 °F Concrete Range: 71 °F Slump Range (inches): 6Th" Weather Conditions: Cloudy Time Started: 06:00 ate Time Completed: 02:30 pm Sample Air Content (y): Total Cubic Yards Placed: 50 Required Strength (Lbs. /sq.in. r: 1000