Loading...
First Methodist-LR011115Construction Materials Testing and Environmental Consulting Test Procedure: ASTM D698 Test Results: Technician: AT cc: Mr. John Rosenberg First United Methodist Church (2) Mr. Ray Larson First United Methodist Church Mr. Eric Royal First United Methodist Church Mr. Larry Davis City of Coppell Mr. Bob Colon Hill Wilkinson Texas CMI Inc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352 -6957 Fax (214) 352 -6972 www .texascmt.com MOISTURE DENSITY RELATIONSHIP REPORT Test Report Date: November 15, 2001 Project No: 201 -0177 Client: First United Methodist Church of Coppell Moisture Report No. 9 Sample Date: November 5, 2001 Project: First United Methodist Church New Parking Lot Identification: Moisture Density Relationship Method A Optimum Moisture Content 13.9 percent Maximum Density 110.0 pounds per cubic foot Rammer Type Manual Material Description Orange Brown Tan Sandy Clay Select fill Material Origin Stockpile on site Moisture Preparation Procedure Air Dry Liquid Limit 30 Plastic Limit 15 Plasticity Index 15 Percent Passing No. 200 U.S. Sieve 43 cc\rA Our letters and reports are for the exclusive use of the client to whom they are addressed. The use of our name must receive out prior written approval. Our letters and reports apply only to the sample tested and/or observed, and are not necessarily indicative of the quantities of apparently identical or similar products. Specimen Measured 'dump iin.) Age ∎Days) Date Tested Total Load i Lbs.I Compressive Strength t Lbsv Sy. In.! Remarks .umber FMC 53 7 11/14/01 94,280 3,330 FMC 54 28 12/05/01 FMC 55 5 28 12/05/01 FMC 56 H HOLD Test Menials Utilized Fracture Regular Cylinders Made By: AB ASTM C- 31.C.39.0 -143 (Unless Not Otherwise) Construction Materials Testing and Environmental Consulting Texas AMT, Inc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: November 15, 2001 Date Concrete Placed: November 7, 2001 Standard 6"x12° Client: First United Methodist Church- Coppell Area 28.27 Square Inches Project: First United Methodist Church New Parking Lot Concrete Report No.: 14 Contractor: Hill Wilkinson Ltd. Project No.: 201 -0177 Concrete Supplier and Plant: LMC #7 Location of Placement: Paving MATERIALS Mix Number: Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: 1 Added Water: Remarks and/or Distribution: 42 15 gallons Source/ SSD Batch We. Description (Lbs/CuYd) cc: Mr. John Rosenberg First United Methodist Church (2) Mr. Ray Larson First United Methodist Church Mr. Eric Royal First United Methodist Church Mr. Larry Davis City of Copped Mr. Bob Colon Hill Wilkinson Texas CMT, Inc. Reviewed by: OBSERVATION DATA Time Sample Batched: 12:45 pm Time Sampled: 01:35 pm Sample Location: NW approach Truck/Ticket No: 757/7110463 Temperature: Ambient Range: 74 °F Concrete Range: 76 °F Slump Range (inches): 5 Weather Conditions: Cloudy rime Started: 06:00 am Time Completed: 03:00 pm Sample Air Content 4% Total Cubic Yards Placed: 130 Lbs. /so.in.: 4.000 Cpl All letters and redone are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CHIT. Inc. The use of our name rind receive our prior wmlen approval. Our lean and moons apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. Specimen Measured Slump, in.) Age ,Days, Date Tested Total Load i Lbs.) Compressive Strength iLbs.i Sq. Ind Remarks .umber FMC 49 7 11/14/01 93,600 3,310 FMC 50 28 12/05/01 FMC 51 51/2" 28 12/05/01 FMC52 H HOLD Test Methods Utilized Fracture RC/pilaf Made By: AB ASTMC.M,C- 39,Cd4 (Unless Noted Otherwise) Construction Materials Testing and Environmental Consulting Texas CMT, Inc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352 -6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: November 15, 2001 Date Concrete Placed: November 7, 2001 Standard 6 "x12" Client: First United Methodist Church Coppell Area 28.27 Square Inches Project: First United Methodist Church New Parking Lot Concrete Report No.: 13 Contractor: Hill Wilkinson Ltd. Project No.: 201 -0177 Concrete Supplier and Plant: LMC #7 Location of Placement: Paving MATERIALS Mix Number: Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: 2 Added Water: Remarks and/or Distribution: cc: Mr. John Rosenberg First United Methodist Church (2) Mr. Ray Larson First United Methodist Church Mr. Eric Royal First United Methodist Church Mr. Larry Davis City of Coppell Mr. Bob Colon Hill Wilkinson Texas CMT, Inc. 42 15 gallons Source/ S5D Batch Wis. Description (Lbs /CUYd) Reviewed by: OBSERVATION DATA Time Sample Batched: Time Sampled: Sample Location: Trude/Ticket No: Temperature: Ambient Range: Concrete Range: Slump Range (inches): Weather Conditions: Time Started: Time Completed: Sample Air Content %l: Total Cubic Yards Placed: Required Strength (Lbs. sq.in 08:40 am 09:15 am 165' W. 73' S. of center of NE approach 947/7110436 61 °F 75 °F 5 Cloudy 06:00 am 03:00 pm 3% 70 4.000 All levers and reports are for the exclusive use of the client a whom they are addressed and shall not be reproduced without the full approval of Teas CMT. hr. The use of our name suet receive our prior written approval. Our levers and reports apply only to the sample tool and/or observed are not necessarily indicative of the quantities of apparently identical or similar products. Specimen Number Measured Slump i in.l Age 'Daum Date Tested Total Load Lbs.t Compressive Strength t Lb` iSq.Isr Remarks FMC 45 7 11 /14/01 90,640 3,210 FMC 46 28 12/05/01 FMC 47 6 28 12/05/01 FMC 48 H HOLD Test Methods Utilized Fracture Reg lar Cylinders Made By: AB ASTM C- 3 1,C -39.0 -143 (Unless Noted Otherwise) Construction Materials Testing and Environmental Consulting Texas CMT, Inc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352 -6957 Fax (214) 352 -6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: November 15, 2001 Date Concrete Placed: November 7, 2001 standard 6 "x12' Client: First United Methodist Church Coppell Area 28.27 Square Inches Project: First United Methodist Church New Parking Lot Concrete Report No.: 12 Contractor: Hill Wilkinson Ltd. Project No.: 201 -0177 Concrete Supplier and Plant: LMC #7 Location of Placement: Paving MATERIALS Mix Number: Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: 2 Added Water: Remarks and/or Distribution: 38 15 gallons Sowcer SSD Batch Wis. Description (Lbs/CuYd) cc: Mr. John Rosenberg First United Methodist Church (2) Mr. Ray Larson First United Methodist Church Mr. Eric Royal First United Methodist Church Mr. Larry Davis City of Coppell Mr. Bob Colon Hill Wilkinson Texas CMT, Inc. Reviewed by: OBSERVATION DATA Time Sample Batched: Time Sampled: Sample Location: Truck/Ticket No: Temperature: Ambient Range: Concrete Range: Slump Range (inches): Weather Conditions: Time Started: Time Completed: Sample Air Content Total Cubic Yards Placed: Required Strength (Lbs. /sq.in.) 06:55 am 07:25 am 93' S. 53' W. of center of NE approach 1093/7110422 60 °F 74 °F 6° Cloudy 06:00 am 03:00 pm 3% 20 3,000 All letters and reports are for the exclusive use of the client to whom they are addressed and shall not he reproduced without the full approval of Texts CMT. Inc. The use of our name muss receive our prior written approval. Our letters and reports apply only to the sample toted and /or observed and are not necessarily indicative of the quantities of apparently identical or similar products.