First Methodist-LR011029Construction Materials Testing
and Environmental Consulting
10044 Monroe Drive
REINFORCING STEEL PLACEMENT
Report Date: 0 Test Date: October 25, 2001
Client:
Project First u nl ed Methodist Church Project No.: 201 -0177
New Parking Lot
Identification Reinforcing Steel Observation
Method of Test Visual Observation
Results
On October 25, 2001, reinforcing steel was observed at the following 'Location:
There were no discrepancies.
Tech; AS
Dallas, Texas 75229
First United Methodist C rch General Report No.: 1
Coppell
Partial parking area north of south tire line
cc: Mr. John Rosenberg First United Methodist Church (2)
Mr. Ray Larson First United Methodist Church
Mr. Eric Royal First United Methodist Church
Mr. Larry Davis City of Coppell
Mr. Bob Colon Hill Wilkinson (2)
All lain and rcNns are lixirc 0.111Sire tne IJ'L diem Mel whom Mel ar nW and snail to
reports apply on, to Me sample tested aM /or °Rn,N
Texas CMT, Inc.
(214) 352-6957
Tvxas lie TkuseoI we nlnle 1110
amn2. ul appuanily !Jamul w fmnlar pr
m
Fax (214) 352-6972
Page 1 of 1
ien eppro al. oar 1e11e15 and