Loading...
First Methodist-LR011022Construction Materials Testing and Environmental Consulting 10044 Monroe Drive Dallas, Texas 75229 Test Report Date Client: Sample Date: Project: Identification: Test Procedure: Test Results: First United Methodist Church of Coppell October 16, 2001 First United Methodist Church New Parking Lot Moisture Density Relationship ASTM D698 Method Optimum Moisture Content Maximum Density Rammer Type Material Description Material Origin Moisture Preparation Procedure Liquid Limit Plastic Limit Plasticity Index Percent Passing No. 200 U.S. Sieve Technician: AT cc: Mr. John Rosenberg First United Methodist Church (2) Mr. Ray Larson First United Methodist Church Mr. Eric Royal First United Methodist Church Mr. Larry Davis City of Coppell Mr. Bob Colon Hill Wilkinson (2) Texas CMT, Inc. (214) 352-6957 MOISTURE DENSITY RELATIONSHIP REPORT Fax (214) 352 -6972 October 22, 2001 Project No 201 -0177 Moisture Report No. 6 A 10.9 percent 109.9 pounds per cubic foot Manual Reddish Brown Clayey Sand brown sandy clay Stockpile west end of site Air Dry 29 14 15 48 Our letters and reports are for the exclusive use of the client to whom they are addressed. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed, and are not necessarily indicative of the quantities of apparently identical or similar products.