Loading...
First Methodist-LR010928UCl4llty IN.CIJVI L iw. .i Vas v a I f Client: First United Methodist Church Coppell, Texas Project: First United Methodist Church New Parking Lot Test Date: September 24, 2001 Report Date: September 28, 2001 Required Density 95% 105% Required Moisture Opt. 5 ±3 %n Material Description Maximum Dry Density (Lbs /CuFt) 114.5 109.9 99.4 Optimum Moisture Content Percent 13.0 16.5 18.6 1. Brown Clayey Sand 2. Light Brown Sandy Clay 3 Dark Brown Clay rest No. Mat Location/Elevation (and /or) Lift In -Place Dry Density (Lbs /CuFt) In -Place Moisture Content Percent Compaction Probe Depth 5 3 P Lift Storm Sewer Station 4 +00 94.8 22.4 95.3 6" 6 3 2" Lift Storm Sewer Station 3 +95 96.2 23.1 96.8 6" 7 3 l Lift Storm Sewer Station s 10 95.1 22.3 95.7 6" 8 3 2" Lift Storm Sewer Station 5 +15 101.1 18.9 101.7 6" Construction Materials Testing and Environmental Consulting 10044 Monroe Drive Texas CMT, Inc. Dallas, Texas 75229 (214) 352 -6957 REPORT OF IN -PLACE DENSITY AND MOISTURE OF SOIL Method ASTM D292 D3017 D698 Fax (214) 352-6972 Pa 1 of 1 cc: Mr. John Rosenberg First United Methodist Church (2) Mr. Ray Larson First United Methodist Church Mr. Eric Royal First United Methodist Church Mr. Larry Davis City of Coppell Mr. Bob Colon Hill Wilkinson (2) Test results meet project specifications Our Inters and reports are for the exclusive use of the client to whom they are addressed. The use of our name must receive our prior written approval. Our letters and report apply only to the sample tested and/or observed, and are not necessarily indicative of the quantities of apparently identical or similar products. Client: First United Methodist Church Coppell, Texas Material Description Maximum Dry Density (Lbs /CuFt) Optimum Moisture Content Percent Project: First United Methodist Church New Parking Lot I. Brown Clayey Sand 114.5 13.0 2. Light Browr Sandy Clay 109.9 16.5 3. Dark Brown Clay 99.4 18.6 Test Date: September 25, 2001 Report Date: September 28, 2001 Required Density 95% 105% Required Moisture Opt. +5 ±3% Mat Location/Elevation (and/or) Lift In -Place In -Place Percent lest No. Dry Density Moisture Compaction No. (Lbs /CuFt) Content l Probe Depth 2 Final Lift Storm Sewer 9 Station 0 +40 102.9 18.3 95.3 6" Construction Materials Testing and Environmental Consulting 10044 Monroe Drive Dallas, Texas 75229 REPORT OF IN -PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 4 (201 -0177) Method: ASTM D2922 D3017 D698 cc: Mr. John Rosenberg First United Methodist Church (2) Mr. Ray Larson First United Methodist Church Mr. Eric Royal First United Methodist Church Mr. Larry Davis City of Coppell Mr. Bob Colon Hill Wilkinson (2) Texas CMT, InC Test results meet project specifications (214) 352-6957 Fax (214) 352 Pa 1 of 1 Our letters and reports are for the exclusive use of the client to whom they am addressed. The use of our name muss receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed. and are not necessanly indicative of the quantities of apparently identical or similar products.