DR9101-CS 900601DATE:
TO:
FROM:
COPPELL PUBLIC WORKS
June 1, 1990
MEMORANDUM
Alan D. R~tl~iff, City M. anager
Larry D/~onstructlon Inspector
Oak Trail Drainage Project
The proposal requested from DeShazo, Starek, and Tang providing
engineering services for the construction of the Oak Trail Drainage
Project have been received.
A copy of the engineering service proposal, preliminary study of
the drainage problem, and other related documents are attached.
If I can be of further assistance, please let me know. Thank you.
CLD/bb
xc: Steve Goram, Director of Public Works
Attachments ~~ ~ ~ ~)~gJ ]QJ~A3~
..