Securelock-CS040122.-EVELOPMENT FEE TABLE
Project: Securelock Self-Storage~
Date: 1/'22/2004
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $3,640.00
(100% due at lssuance of Building Permit)
Water Tap Inspection Fee $200.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domcstic) $62.25
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $4,390.16
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigatioa/Fireline Meter Deposit $90.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $700.00
(I 00% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final inspection Fee S50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $10,153.44 $10,153.44
'(100% due prior to Council Approval)
Street Light Fee [ntbrmation not Available
(I00% due prior to Acceptance of Project)
Street Sign Fee Information not Available
(t 00% due prior to Acceptance of Project)
Construction Inspection Fee Infomaat~on not Available
(100% due prior to Start of Construction)
TOTAL $19,365.85
TOTAL AMOUNT DUE PRIOR IO COUNCIL APPROVAL $I0,15344
dEVELOPMENT FEE WORKSHEE'I
PROJECT: Securelock Self-Storage revised
DATE: 1/22/2004
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
1 - 1 inch = 2.5 ESU's
I - 2 inch 8 ESU's
0 0 ESU's
2 - 8 inch 2.5 ESU's
Total #: 13 ESU's @ $280,00 ea.
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #: 4 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) @ $6225
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
lrrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $205.28
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 2 Fireline Meter(s) @ $2,092.44
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 3 Meter(s) @ $30.00 ea,
(100% due prior to issuance of water meters)
Wastewater hnpact Fee:
Total Domestic Meters ESU's: 2.5
(Due prior to issuance of building permit)
@$28000 ea
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$3,64000
$200.00
$62.25
$205,28
$0.00
$4,184.88
$30.00
$9000
$700,00
$5O.OO
$50.00
$0,00
$000
Park Fee (For Residential Developments Only):
* Preliminary plat approved: After October 26, 1993
0
0
Single-family @ $000 per lot
Multi-family @ $0.00 per unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Page 1
dEVELOPMENT FEE WORKSHEE'f
Roadssay hnpact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light wilJ be assessed.
{100% due prior to final acceptance of development)
$10,153,44
Information not Available
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if appficable)
Information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private tmprovements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROAD WAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Securelock Self-Storage revised
1/22/2004
ROADWAY IMPACT FEE:
Service Area * 9
Category ** Industrial
Land Use ** Mini-Warehouse
Building Area (sf) 51,280
Development Units ** 51.28
Vehicle Miles per Development Unit ** 0.66
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
(Veh c e M es per Development Unit) x (Fee per Vehicle Mile) = $10,153.44
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)