ST9304-RP030606DALLAS COUNTY PUBLIC WORKS June 6, 2003 Mr. Kenneth Griffin, P.E. City of Coppell P.O. Box 478 Coppell, Texas 75019 re: Belt Line Road Project 91-829 (Denton Tap Road to MacArthur Blvd) Final City Billing Dear Mr. Griffin: The subject project has been completed for a total cost of $6,752,106.83. Enclosed you will find a copy of the final construction estimate and a breakout of 100 % City reimbursable items. The total amount of the City items is $398,366.27. The City has previously paid $353,567.49 leaving an amount due of $44,798.78. Please have the check made to Dallas County and remm to this office for processing. We sincerely appreciate the City's participation in this important transportation project. Sincerely, Mears, P.E. Senior Project Manager Attachments JLM:829: cityltr:jcn 411 Elm Street, 4th Floor Dallas, Texas 75202 (214) 653-7151 BELT LINE ROAD (DENTON TAP ROAD TO MACARTHUR BLVD.) PROJECT (91-829) (~-[ q ~-0 4) CITY OF COPPELL REIMBURSEMENT ITEMS 618 CONDUIT (2")(PVC)(SCHED 40) 618 CONDUIT (2")(PVC)(SCHED 40) BORE 618 CONDUIT (3")(PVC)(SCHED 40) 618 CONDUIT (4")(PVC)(SCHED 40) 618 CONDUIT (8")(PVC)(SCHED 40) 618 R.M. CONDUIT (BRIDGE) 618 R.M. CONDUIT 624 REPL. EX. TRAFFIC BOX 624 PULL BOXES 624 RE-ROUTE SPARE CONDUIT ~ LIGHT BASES 624 FURNISH AND INSTALL PULL BOXES 656 FOUNDATIONS FOR ILLUM. POLES $105,793.97(43%)= $945.00(43%)= $12,666.50(43%)= $25,721.00(43o/o)= $60,520.00(43%= $6,062.00(43%)= $788.50(43%)= $500.00(43%)= $2,000.00(43%)= $2,798.25(43%)= $9,817.00(43 %)= $4,100.00(43%)= $45,491.41 $406.35 $5,446.60 $11,060.03 $26,023.60 $2,606.66 $339.06 $215.00 $860.00 $1,203.25 $4,221.31 $1,763.00 666 THERMO. PVMT. MARKINGS (24")(TY I) 668 PREFAB. PVMT. MKINGS. (SYMBOL)(WHITE) 668 PREFAB. PVMT. MKINGS. (LEGEND)(WHITE) 672 TRAFFIC BUTTONS (4")(W) 672 TRAFFIC BUTTONS (4")(I-W-C) 677 ELIM. EXIST. PVMT. MARKINGS $5,124.00(43%)= $2,200.00(43%)= $2,750.00(43%)= $9,271.50(43%)= $20,070.00(43%)= $3,720.65(43o,4)= $2,203.32 $946.00 $1,182.50 $3,986.75 $8,630.10 $1,599.88 680 TRAFFIC SIGNAL AT MOCKINGBIRD $98,628.20(100%)= $98,628.20 680 TRANSFORMER TYPE SIGNAL BASE 684 RELOCATE TRAFFIC SIGNAL DETECTORS 686 RELOCATE TRAFFIC SIGNAL POLES 688 TRAFFIC SIGNAL DETECTORS $6,552.00(100%)= $6,552.00 $3,351.60(100%)= $3,351.60 $500.00(100%)= $500.00 $7,870.02(100%)= $7,870.02 5899 PAVERS (BRICK) $175,366.40(43%)= $75,407.55 W. 1 ADJUST 24" WATER LINE W.3 CONC. ENCASEMENT W.4 CONNECT PROP. 24" W.L. TO EX. 24" W.L. W.5 24" BUTTERFLY VALVE W.6 6" BLOWOFF VALVES W.7 RELOCATE BLOWOFF VALVES $50,697.60(100%)= $50,697.60 $4,130.00(100%)= $4,130.00 $10,086.00(100%)= $10,086.00 $15,695.28(100%)= $15,695.28 $4,171.20(100%)= $4,171.20 $3,092.00(100%)= $3,092.00 TOTAL= $398,366.27