Loading...
ST9905-CS031028 (2)LETTER OF TRANSMITTAL 3010 LBJ Freeway, Suite 990 (972) 280-9300 * Fax (972) 280-9715 TO: FROM: Mr. Ken Griffin, P.E. Director or Engineering and Public Works 255 Parkway Coppell, TX 75019 Craig Bond DATE: October 28, 2003 NO. 20000890 RE: Bethel Road Project Addendum #2Rev WE ARE SENDING YOU VIA: [] Mail [] Delivery, THE FOLLOWING ITEMS: COPIES I DESCRIPTION 2 Bethel Road - Addendum #2 Revised THESE ARE TRANSMITTED AS CHECKED BEEDW: [] For Your Use [] For Review and Comment [] As Requested [] For Approval [] Approved as Submitted [] Returned for Corrections [] See Remarks [] Approved as Noted [] Rejected REMARKS: Ken, Attached is revised Addendum #2. Costs for the additional topographic survey along the channel has been removed per our meeting on 10/27/03. I also removed reference to the additional topographic survey. Please sign and return one copy to TranSystems. Thank-you. Craig CoPY To: SIGNED: Craig Bond, P.E. G:\200\00890-Coppell~dm~Faxes and Transmittals\T-ken6 doc