ST9905-CS031028 (2)LETTER OF TRANSMITTAL
3010 LBJ Freeway, Suite 990 (972) 280-9300 * Fax (972) 280-9715
TO:
FROM:
Mr. Ken Griffin, P.E.
Director or Engineering and Public Works
255 Parkway
Coppell, TX 75019
Craig Bond
DATE: October 28, 2003 NO. 20000890
RE: Bethel Road Project
Addendum #2Rev
WE ARE SENDING YOU VIA: [] Mail [] Delivery, THE FOLLOWING ITEMS:
COPIES I DESCRIPTION
2 Bethel Road - Addendum #2 Revised
THESE ARE TRANSMITTED AS CHECKED BEEDW:
[] For Your Use [] For Review and Comment
[] As Requested [] For Approval
[] Approved as Submitted
[] Returned for Corrections
[] See Remarks
[] Approved as Noted
[] Rejected
REMARKS:
Ken,
Attached is revised Addendum #2. Costs for the additional topographic survey along the channel has been removed per
our meeting on 10/27/03. I also removed reference to the additional topographic survey. Please sign and return one
copy to TranSystems. Thank-you.
Craig
CoPY To: SIGNED:
Craig Bond, P.E.
G:\200\00890-Coppell~dm~Faxes and Transmittals\T-ken6 doc