Loading...
Magnolia Rest-LR030827RoneEngineers REPORT OF STRUCTURAL STEEL INSPECTION 6906 Ambassador Row Dallas, Texas 76247 214.630.9745 FAX 214.630.9619 Client: Purple Mountain Construction Report #: 601863 Project: Deliman Grill Project #: 037748 605 North Denton Tap Road Date of Service: 08/27/03 Coppell, TX Service: Perform a Structtral Steel Inspection as detailed below. Drawings Utilized: Structural, AWS Dl.l-02 Locations and Items Inspected: Listed below *Discrepancies /Comments: Rona Engineers arrived at the above location to perform structural steel inspection as requested by Superintendent Dean Preston with Purple Mountain Constructors. I. Anchor bolt tension verification of all thirteen columns was found in compliance with erection drawings and job specifications, compliant. II. Bar joists inspection -the welded bar joists were inspected to AWS Dl.l-02 and erection drawings. All welded joists complied, no deviations were noted, compliant. III. During the inspection of items I and II, the following deviations were noted: A. *Base plates of columns are'h inch thick and not'/a inch as shown on drawings. Clarification is needed of this deviation. (non-compliant) B. *No clearance in between base plates of columns and floor slab. One inch clearance is needed as shown on the erection drawings. At some columns, there is Y< inch clearance and at others, no clearance at all. Superintendent was made awaze and clarification of this deviation (clearance is for grouting purposes). (non-compliant) C. *Need approvaUclarification for torch cut holes on base plates of columns located at the north side and the west side of the building. Base plate columns were identified with pink flags (no grid lines). (non- compliant) D. *Need approval/clarification for torch cut holes on splicing plates at north and south sides of the building (splicing plate used for transition of beam size). (non-compliant) E. *Requested WQT's for welders to erector's foreman (Rock & S Constructors) WQT's to be submitted on the next visit. (non-compliant) Mike Tupa Af "''' Certified Welding Inspector Ml ~f~NPA CWI #94030831 _.._ Page 2 of 2 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similaz subject matter provided by persons or conditions over which we have no control. Our letters and reports are £or the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rane Engineers, Ltd. RorieEngineers ~~-` Client: Purple Mountain Construction Services Attn: Mr. Jeff Burlcham 4712 Memphis St. Dallas TX 75207 Project: Deliman Grill 605 N. Denton Tap Road Coppell, TX Services: Cylinder Collection 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TR 76118 6300 Rothway, S[e. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 REPORT OF CYLINDER COLLECTION Report No.: 192901 Project No.: 037748 Date of Service: 08/21/2003 Report Date: 08/27/2003 of Collection On this date, a Rone Engineers, Ltd. representative arrived on site as scheduled to pick up compressive strength test specimen cast prior to this date. Technician Time: 9:30am - 10:45am Page 1 of 1 Technician: Ryan Armstrong Report Distribution: (I) Purple Mountain COIISlILChon Services LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided far testing. We assume no responsibility for variation in qualiTy (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they aze addressed and shall no[ be reproduced except in firll without the written approval of Rone Engineers, Ltd. 99DD PaEe 1 of 1