Loading...
Magnolia Rest-LR030819- ', 8908 Ambassador Row, Dallas, TX 75247 R M ~ M ~' j p 2696 Gravel Drive, Port Worth, TX 76118 ~7 \O ~ ~ E I I g I I 1 ~ ~i I S 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 IN-PLACE DENSITY TESTING Client: Purple Mountain Construction Services Report No.: ] 92569 Attn: Mr. JeffBurlcham Project No.: 037748 4712 Memphis St. Date of Service: 08/13/2003 Dallas TX 75207 Report Date: 08/19/2003 Project: Deliman Grill 605 N. Denton Tap Road Coppell, TX Services: Perform In-Place Density Test in accordance with ASTM Standazds. PROJECT DATA CONTRACTOR: Purple Mountain Constmction Gauge: Troxler 3430 Standard Counts Teat Methods: Age D-2922 Moisture Density ASTM D-3017 Gauge Serial No: 33305 Current: 557 Current: 2720 Test Mode: DT previous: 558 Previous: 2714 MOISTURE DENSITY RELATIONS Maximum M/D No. Description Moisture % Density pct 1 Medium Brown Clayey Sand 11.5 117.0 -1/+3 95 min 2 Light Brown Sandy Clay 20.0 100.0 -1/+3 95 min TEST NO TEST LOCATION PROBE DEPTH M/D MOISTiJRE WET DENSITY DRY DENSITY No. (%) (pct) (pct) DENSITY (% maz) Paving 1 5' west by 25' north from northwest building 6" 2 12.2* 116.9 104.2 104 corner, final grade Paving 2 45' west by 20' north from northwest 6" 2 12.9* 119.3 105.7 106 building comer, final grade Paving 3 70' north and 40' west from southwest 6" 2 14.0* 111.8 98.1 98 building comer, final grade An asterisk (*) appears next to test results which do NOT meet the project specifications. Density tests over 102;4 may be due to mismatch of material or low moisture LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in qualiTy (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 07DF Page 1 of 2 Protect Requirements Moisture Denatty Report No.: 192569 RoneEngineers Project No.: 037748 Client: Purple Mountain Construction Services ~~® content. Technician: Scott Fagan Report Distdbu[ion: (1) Purple Mountain ConsWCtion Services Started: 7:3OAM Finished: 9:15 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation is qualiTy (composition, appearance, performance, etc.) or day other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and sha(I not be reproduced except in full without the written approval of Rone Engineers, Ltd. 07DF Page 2 of 2