Loading...
Magnolia Rest-LR0308188908 Ambassador Row, Dallas, TX 75247 a 2696 Cravel Drive, Fort Worth, TX 76118 Ro n ~ E n g i n ee rs 6300 Rothway, Ste. 150, Houston, TX 77040 a 1 - ~ Corporate Phoae: (214) 630.9745 IN-PLACE DENSITY TESTING Client: Purple Mountain Construction Services Report No.: 192237 Attn: Mr. JeffBurldlam ProjectNo.: 037748 4712 Memphis St. Dallas TX 75207 Date of Service: 08/06/2003 Report Date: O8/] 8/2003 Project: Deliman Grill 605 N. Denton Tap Road Copped, TX Services: Perform In-Place Density Test in accordance with ASTM Standards. PROJE T DATA CONTRACTOR: Purple Mountain CoustmcHon Standard Counts Test Methods: ASTM D-2922 Cauge: Troxler 3430 Moisture Density ASTM D-3017 Cauge Serial No: 24675 Current: 608 Current: 2825 Test Mode: DT MOISTURE DENSITY RELATIONS Mazimum M/D No. Deurlpdon Motature % Density pcf Prevlouc: 605 Previous 2876 Light Brown Sandy Clay 20.0 100.0 Protect Requirements Moisture Density NA 95 min TEST NO TEST LOCATION PROBE DEPTH M/D No. MOISTURE WET DENSITY DRY DENSITY (%) (pct) (pcf) DENSTTY (% max) Subgrade 1 Paving, firelane, northside, 60' south & 70' 4" 1 17.3 115.8 98.7 99 west of southwest corner of existing paving , Subgrade 2 Paving, firelane, northside, 50' south & 45' 4" 1 17.3 114.8 97.9 98 west of southwest corner of existing paving Subgrade 3 Paving, firelane, northside, 20' south & 5' 4" 1 17.7 117.1 99.5 100 west of southwest corner of existing paving ' Test results on this report meet proj ect specification. ~ / ~~ Technician: Richard Bunion Started: 10:00a Finisbea: 11:OOa Report Distribution: (I) Purple Mountain Construction Services - Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 07DD Page 1 of 1 8908 Ambassador Row, Dallas, TX 75247 Ro 1'9 e E n g i n e@ rs =696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 - Corporate Phone: (214) 630-9745 IN-PLACE DENSITY TESTING Client: Purple Mountain Construction Services Report No.: 192594 Attn: Mr. JeffBurkham Project No.: 037748 4712 Memphis St. Dallas TX 75207 Date o[ Service: 08/13/2003 Report Date: 08/18/2003 Project: Delilnan Grill 605 N. Denton Tap Road Coppell, TX Services: Perform In-Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Purple Mountain Constmction Standard C ounts Gauge: Troxler 3430 Test Methods: ASTM D-2922 Moisture Density ASTM D-3017 Gauge Serial No: 32685 Current: 642 Current: 2962 Test Mode: DT previous: 623 Previous: 2918 MOISTURE DENSITY RELATIONS Maximum Proj ect Requirements M/D No. Descriptlon Moisture % Density pcf Moisture Density 1 Light Brown Sandy Clay 20.0 100.0 -1/+3 95 min TEST NO TEST LOCATION PROBE DEPTH M/D No. MOISTURE (%) WET DENSITY DRY DENSITY (pcQ (pcQ DENSITY (% max) Paving Subgrade I Retest from report #192569 6" 1 21.4 119.3 98.3 98 Paving Subgrade 2 Retest from report #192569 6" 1 20.9 119.2 98.6 99 Paving Subgrade 3 Retest from report #192569 6" 1 20.8 120.2 99.5 100 Test results on this report meet proj ect specifica tion. ~~ /J~ Technician: Joe Jernigan Started: 2:30PM Finished: 4:OOPM Rone Report Distribution: (1) Purple Mountain Conswction Services Project LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composidon, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. o7DP Page 1 of 1 8908 Ambassador Row, Dallas, TX 75247 Ro n e E n g i n e e rs 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rathway, S[e. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 IN-PLACE DENSITY TESTING Client: Purple Mountain Construction Services ' Report No.: 192328 Attn: Mr. Jefl Burlcharrt Project No.: 037748 4712 Memphis St. Dallas TX 75207 Date of Service: 08/07/2003 Report Date: 08/18/2003 Project: Deliman Grili 605 N. Denton Tap Road Coppell, TX Services: Perform In-Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Purple Mountain Construction Standard Counts Test Methods: Gauge: Troxler 3430 ASTM D-2922 Moisture Density ASTM D-3017 Cauge Serial No: 33305 Current: 563 Current: 2768 Teat Mode: DT previous: 550 Previous: 2723 MOISTURE DENSITY RELATIONS M/D No. Description Moisture % Maximum Density pcf Projec[ Requirements Malsture Densi[y 1 Reddish Brown Clayey Sand 11.0 119.5 -1/+3 95 min 2 Light Brown Sandy Clay 20.0 100.0 -1/+3 95 min 3 Medium Brown Clayey Sand 11.5 117.0 -1/+3 95 min TEST NO TEST LOCATION Paving 75' north, 75' east from northeast building 6" 3 10.8 128.5 corner, final Test results on this report meet project specification. PROBE DEPTH M/D MOISTURE WET DENSITY DRY DENSITY No. (%) (pcQ (pcf) DENSITY (% max) Technician: Scott Fagan Started: 12:45p Finished: 2:30pm RORe Report Distribution: (I) Purple Mountain Constmction Services Clay Project 99 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility far variation in quality (composition, appearance, performance, etc J or any other Feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in &11 without the written approval of Rone Engineers, Ltd. 07DD Page 1 of 1