Loading...
ST9502-CS 950411INFORMATION & CUSTOMER SERVICES DATE: TO: FROM: RE: MEMORANDUM April 11, 1995 Ken Griffin, Assistant City Manager/City n ~er Steven G. Goram, Director of Information & omer Services Landscape Maintenance Cost Estimate; Town Center Road to Police/Courts Attached is the cost estimate prepared by Dennis Slayton for the irrigation/landscaping in the median of the proposed roadway west of Town Center to link with the new Police/Courts facility. If you have any questions, please contact Dennis or me to discuss. SGG/sm attachment COST ESTIMATE FOR TOWN CENTER MEDIANS Materials Meter & D.C. A. Copper Heads PVC Pipe Valves Controller/Satellite Radio Equipment Wire. Sleeve Material Miscellaneous Parts 01 203 3/4" 3,000' 1" 1,500' 11/4" 1,000' 11/2" 500' 11/2" 6 1" 3 14 ga. 2500' 6' 400 40% Labor Estimated contractor's cost Trees Red Oaks (Shumardi) Cedar Elm Bradford Pears Grand Total for Irrigation Installation and Tree Installation 1.90 ea. 7.13 per/100' 9.77 per/100' 14.82 per/100' 19.21 per/100' 36.58 ea. 10.71 ea. .04 per/ft. 2.14 per/ft. 400.00 ea. 400.00 ea. 400.00 ea. $ 1,100.00 100.00 385.70 213.90 146.55 148.20 96.05 219.48 32.13 2,205.60 2,400.00 250.00 1,284.00 3.000.00 $11,581.61 $10,000.00 $ 3,200.00 3,200.00 3.200.00 $ 9,600.00 $31,181.61 T" III