Loading...
Magnolia Rest-LR030805RoneEngineers Client: Purple Mountain Construction Services Atto: Mr. JeffBurldaam 4712 Memphis St. Dallas TX 75207 Project: Services: Deliman Grill 605 N. Denton Tap Road Coppell, TX Perform In-Place Density Test in accordance with ASTM Standards. 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 IN-PLACE DENSITY TESTING Report No.: 191327 Project No.: 037748 Date of Service: 07/24/2003 Report Date: 08/05/2003 PROJECT DATA CONTRACTOR: Purple Mountain Construction Test Methods: ASTM D-2922 ASTM D-3017 M/D No. Description Gauge: Troxler 3430 Moisture Gauge Serial No: 34009 Current: 642 Test Mode: DT Previous: 641 MOISTURE DENSITY RELATIONS Maximum Reddish Brown Clayey Sand Standard Counts Density Current: 2903 Moisture % Density per Previous: 2881 Project Requirements Moisture Density 11.0 119.5 Optimum + 95 min 2 Medium Brown Clayey Sand 11.5 117.0 Optimum + 95 min FIELD DENSITY TESTS TEST PROBE NO TEST LOCATION DEPTH M/D MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (pc0 (Pc0 (% max) 12.0 123.9 110.6 Building Pad/Select Fill 1 20' south, 30' west of the northeast comer of 6" 2 the building Building Pad/Select Fill 2 15' south, 50' east of the northwest comer of 6" 2 13.5 the building Building Pad/Select Fill 3 10' north, 20' east of the southwest comer of 6" 2 12.1 the building 129.9 114.4 126.1 112.5 Test results on this repo~ meet pr~ect specification. Building pad material tested on 7/8/03, report #190421, was removed due to a change in material. The material installed on 7/8/03 had a plasticity index 95 98 96 LIMiTATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients m whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 07DD Page 1 of 2 Report No.: 191327 Rone£n~gine~ers Project No.: 037748 Client: Purple Mountain Construction Services ............... greater than specified range of 6 to 16. Technician: Jan-od Miller Report Distribution: (1) Purple Motmtain Construction Services Started: 8:00am Finished: 9:30am Rone~g~ Project nager LIMITATIONS: The test results presented he.in were prepared based upon the epe~i flc samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive we of the clients to whom they are addressed and shall not be reproduced except in full without the wr?aen approval of Rone Engineers, Ltd. 07DD Page 2 of 2