Loading...
Magnolia Rest-LR030801 gineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76110 6300 Rothway, Ste. 150, Houston, TX 77040 Coeporate Phone: (214) 630-9745 REPORT OF REINFORCING STEEL INSPECTION Client: Purple Mountain Construction Services Arm: Mr. Jeff Burkham 4712 Memphis St. Dallas TX 75207 Project: Deliman Grill 605 N. Denton Tap Road Coppell, TX Services: Reinforcing Steel Inspection Report No.: 191521 Project No.: 037748 Date of Service: 07/28/2003 Report Date: 08/01/2003 Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) arrived on site as scheduled to perform Reinforcing Steel Inspection. The results are attached. Technician Time: Page 1 of 2 Technician: Jason Creasy Report Distribution: (1) Purple Mountain Construction Services 2:00pm - 5:00pm , S~k Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no msponsibilily for vafiation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wrlttea approval of Rone Engineers, LM. 99DD PaRe 1 of I RoneEn gineers 8908 Ambassador Row Dallas, Texas 75247 (214) 630-9745 121 North Rayner Fort Worth, Texas 76111 (817) 831-6211 Report of Reinforcing Steel Inspection Client: ~ ~-~ t/io ,~--~., / / ReportNo.: Project: ~L~ ~ z~;( ":~ (.~ ~ Date of Se~ice: ' '"i ' ~ 7'- 2~ .-.o ~' Page / of / Locations and Items Inspected: ?lacing Drawings ~ Bar Length V//( Cotumn Ties Properly 3ar Size ~ Proper Bar PI ..... t ~/ Stirrup Spacing and Type 3ar Grade .~" Properly Tied X Lapped Splices ?orm Clean X Proper Bar Supports ~ Mechanical Splices NumBer Bars ~ Proper Cover ~ Discrepancies / Comments: I nspectorsS~gna~re: ~~~ ~. . _ .~ Time: to Client/Contractor Si~ature~ ~ ~ ClienffCon~actor Copied with Results~H¢~/~ No RoneEngineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630~9745 REPORT OF REINFORCING STEEL INSPECTION CHent: Purple Mountain Construction Services Atto: Mr. JeffBurkham 4712 Memphis St. Dallas TX 75207 Report No.: 191564 Project No.: 037748 Date of Service: 07/29/2003 Report Date: 08/01/2003 Project: Services: Deliman Grill 605 N. Denton Tap Road Coppell, TX Reinforcing Steel Inspection Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) arrived on site as scheduled to perform Reinforcing Steel Inspection. The results are attached. Technician Time: Page 1 of 2 Technician: Jason Creasy Report Distribution: (1) Purple Mountain Construction Services 4:30am - 6:00am Project Manager LIMiTATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, perfonnance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DD Pace 1 of 1 8908 Ambassador Row Dallas, Texas 75247 (214) 630-9745 121 North Rayner Fo~t Worth, Texas 76111 (817) 831-6211 Client: Project: Report of Reinforcing Steel Inspection /¢7~A/7~/C/A/ Report No.: Project No.: ~IL/_- Date of Service: Page / of / Locations and Items Inspected: Items Inspected: Conforming Non Items Inspected: Conforming Non Items Inspected: Conforming Non / Conforming Conforming Conforming Placing Drawings ~//e/ Bar Length ~r Eolumn Ties Properly Approved and Shape tied and Spaced Bar Size W'/F. Proper Bar Placement V[ Stirrup Spacing and Type ~/ Bar Grade ~ Properly Tied X Lapped Splices ~ Bars Clean ~ Dowel Bars in Place , Welded Splices Foma Clean ~ ?roper Bar Supports ~c~ ~ ~ Mechanical Splices Number Bars V/' ~ ,_--~ Proper Cover ~ ~r~ ~ ~ Discrepancies / Comments: ,nJ;~tor's ~ignamre: ~~{~' Time: r / aien Con ac °rCopiedwi h ¢ t o ClienffContractor Signatu ~: :_, RoneEn g Client: Purple Mountain Construction Services Arm: Mr. JeffBurldmm 4712 Memphis St. Dallas TX 75207 Project: Deliman Grill 605 N. Denton Tap Road Coppell, TX Services: Cylinder Collection 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 REPORT OF CYLINDER COLLECTION Report No.: 191623 Project No.: 037748 Date of Service: 07/30/2003 Report Date: 08/01/2003 Report of Collection On this date, a Rone Engineers, Ltd. representative arrived on site as scheduled to pick up compressive strength test specimen cast prior to this date. Technician Time: 8:45 AM - 10:00 AM Page 1 of 1 Technician: Jason Creasy Report Distribution: (1) Purple Mountain Construction Services Pf'ayj ectIdanager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be ~.produced except in full without the written approval of Rone Engineers, Ltd. 99DF Page 1 of I