Magnolia Rest-LR030604RoneEn gineers
8908Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF WATER INJECTION INSPECTION
Client:
Purple Mountain Construction Services
Attn: Mr. JetTBur!oham
4712 Memphis St.
Dallas TX 75207
Report No.: 177321
Project No.: 037748
Date of Service: 05/27/2003
Report Date: 06/04/2003
Project:
Services:
Deliman Grill
605 N. Denton Tap Road
Coppell, TX
Water Injection Inspection
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) was on site to perform
Water Injection Inspection. The results are attached.
Technician Time: 7:00 a.m.
Page 1 of 3
Technician: Rormie Jenkins
Report Distribution:
(1) Purple Mountain Construction Services
- 11:30 a.m.
Rone
Ltd.
Stark
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject mat/er provided by persons or conditions over which we have no control. Our letters and
repons are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in fall without the wriaen approval of Rone Engineers, Ltd.
99DD Page I of 1
WATER
INJECTION OBSERVATION
Client:
Project:
Purple Mountain Construction Services
Deliman Grill
605 N. Denton Tap Road
Report No.: 177321
Project No.: 037748
Date of Service: 5/27/2003
Page 2 of 3
Coppell, TX
DESCRIPTION/EXPLANATION YES NO N/A
1. specific gravity of lime was checked and found to be 1.14 and 1.17 X
2. Lime slurr~ was continuously a~litated X
3. Surfactant was added to each load X
3. The iniection pressure was kept between 50 to 100 psi at point of iniection X
5. Intervals of 12" were achieved durin~l iniection process until refusal X
5. Total depth of iniection -- 10 feet X
~'. Max. spacin~ of injection probes was recorded to be 5 ft. X
3. Free lime on surface X
9. Square feet iniected on this date 3,600 sq ft
10. Location of iniection Buildin~ pad
Remarks: Injector did not use surfactant.
See attached for sketch of injected area, pass number for each area and dimension of injection area.
Time:
Technician:
7:00 a.m. - 11:30 a.m.
Ronnie Jenkins
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for
vadaflon in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we
have no control. Our letters and repor[s ars for the exclusive use of the clients to whom they are addressed and shall not be reproduced except Jn full without
the wdtten approval of Rone Engineers, Ltd.