Loading...
Freeport NIP(7.4)-CS040127From: To: Date: Subject: Keith Marvin Langston, Jeff 1/27/2004 8:04:36 AM Re: Freeport VI Paving Addition Jeff, Your spredsheet looks good to me. When you bring in a check for the $1,480.50, that will take care of the fee issues. Once Jack Evans gets the revised drawings in, we should be ready to go. Keith R. Marvin, P.E. City of Coppell (972) 304-7044 kmarvin@ci.coppell.tx.us >>> "Jeff Langston" <jeff.langston@dukeconstructiononline.com> 1/26/2004 4:13:32 PM >>> Please review the attached breakout of paving costs and related inspection fees for the paving addition at our Freeport VI building on Royal Lane. Let me know if this looks correct and I will proceed with getting a check cut. Thanks <<Coppell - Site Devel. Permit Breakdown.xls>> Jeff Langston Project Manager (972) 361-6707 (972) 361-6800 (Fax) ieff. lanqstonC, dukeconstructiononline.com Earthwork (Private) Erosion Protection Clear & Grub Site Strip Topsoil Mass Excavation Backfill Curbs and Fine Grading Site Utilities (Private) Site Storm Site Sanitary Site Utilities (Public) None Site Paving (Private) Site Paving Sidewalk Site Paving (Public) Site Paving (Approach) Freeport VI - Parking Addition 601 Freeport Parkway Site Development Fee Breakdown Cost $75O $1,000 $500 $9,000 $1,000 Inspection Fee Amount Total $12,250 x 2% = $245.00 $3,725 $150 Total $3,875 x 2% = $77.50 $49,200 $6,700 Total $55,900 $1,000 x 2% = $1,118.00 x 4% = $40.00 Total $'1,480.50