Loading...
St Andrews Est-CS040127 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To; From; Date: RE: January 27, 2004 St. Andrews Estates Site Visit 1/27/04 at 1:30 p.m. Upon arrival at location it was noticed that the existing screen wall has been removed, the landscaping adjacent to the screen wall has been removed, as well as disturbance in the drainage channel which flow exits this property to the Estrada property to the west. The disturbance has disrupted the low flow area and is in need of immediate attention. I observed that the existing services to the site: Water Sanitary Sewer Electric Power Underground Gas Oil / grease traps are still apparently in service and have not been properly disconnected or removed. Demolition is taking place in, around and above these areas. Demolition seems to be located in 3 areas: the two existing structures, the existing paving and driveway area, and the unpaved area from the buildings south to Deforest Rd. Concerns; I was unable to ascertain if · a demolition permit exists · a set of drawings from the civil engineer that has been review & approved by Eng. Dept.exists · tree removal and mitigation permit exists It would appear that there are a number of violations, relating to the City, state of TX and FEMA. It is my opinion that the owner/operator needs to take positive action immediately to be in compliance. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"