Loading...
PA9702-LR 990701 (2)CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 06/21/1999 Report No.: 9916969 Report Date 07/01/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Co 11 Project: Coppell Aquatic/Recreation Ctr Attn: Bra~P~eiid 300 Block of Parkway Blvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: ~btainsamp~es~ffreshc~ncreteatthep~acement~ocati~ns~perf~rmrequired~e~dtestandcast compressive strength samples. PROJECT DATA CONTRACTOR: t-]isaw & Assoc. CONCRETE CLASS: 6 Sack CONCR/~'E/~SUPPLIER: Nelson Bros. pLACEIvlENTDATE: 06/21/1999 BATCHT!IVIE: 12:32pm PLANT: Lewisville x~lE SAMPLED: 1:20pm BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER COSOrrIONS: Cloudy STRESGTH: 4000 psi @ 28 Days TEMPERATtrRE (F) - Am 83 F CONCRETE: 83 F SLtr~W: 4.0-6.0" XRX~CKNO: 217 T~CKETt~O: 73803 Ant: N/A AreCONTENT(%): N/A tnvrrWEIGUT(pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Pier information and technician time: See Report gO916968 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Light pole pier (2) REPORT OF TESTS ACCUMULATIVE YARDS: 20 CYLINDER MEASURED MAXIMtIM COMPRESSIYE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (Ibs. force) (l~l) TYPE 1 1 6.00 06/28/1999 7 92060 3260 1 2 6.00 06/28/1999 7 98010 3470 Average 3370 1 3 6.00 07/19/1999 28 1 4 6.00 07/19/1999 28 Technician: Mike Odom Started: Finished: I']~2,~E~inecring, Inc. Report Distribution: (1) City of CoppcIl (1) City ofCoppell - Engineering ( 1 ) B rinkIcy Sargent Architects ( 1 ) City of Coppoll ~ BIdg. Insp. Eugene Harbour ( I ) Turner Eagineers ( 1 ) City of Coppoll - Leisure Sew Dept Vice President (1) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Eagineelfug, Inc. 0ILL Page 1 of 1