Loading...
Bank One-LR031030MORTAR COMPRESSIVE STRENGTH TEST Report Number: 94031289.0063 Service Date: October 1,2003 'lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Bank One Texas NA Attn: Danny Buckner 8111 Preston Suite 250 Dallas TX 75225 Report Date: October 30, 2003 Project: Bank Qne - Coppell TX 616 North Denton Tap Rd Coppell, TX Project Number: 94031289 Contractor: Mortar Supplier: Plant: On-Site Specification Requirements: Strength: 1800 psi ~ 28 Days Test Methods: ASTM C109 ASTM C270 Cube Marked Set No. 1 PROJECT DATA Mortar Mix I.D.: Type S Placement Date: 10/01/2003 Batch Time: 10:05am Time Sampled: 10:15am By: Joseph B. Gordon Weather Conditions: Clear Temperature (F)- Air 73 °F Mortar: 79 °F Truck No: Ticket No: Sample Size: 2 x 2 x 2 Sample Location: Course 28 Placement Location: Line A from 2 to 4 courses 25-35 REPORT OF TESTS Measured Measured Maximum Compressive Slump Flow Date Age Load Strength (inches) (seconds) Tested (days) (lbs. force) (psi) 10/08/2003 7 13040 3,260 1 2 10/29/2003 28 15530 3,880 1 3 10/29/2003 28 15780 3,950 Average 3,920 Services- Obtain a sample of masonry mortar used during construction and cast 2 inch cube specimens for compressive strength determination. Technician: Joseph B. Gordon Report Distribution: (1) Bank One Texas NA (1) City of Coppell TX (1) Aguirre Building Systems (1) City of Coppell TX Reviewed by: HBC/Terracon Hussein H.~ us~ad, PE. Senior Proiect Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials