Bank One-LR031015REPORT OF REINFORCING STEEL OBSERVATION
8901 Carpenter Frwy , Suite #100
Date of Service: 10/15/03 Report No.:
Client No.: 17776 Project No.:
Client: Bank One Texas NA Project:
8111 Preston Suite 250
Dallas, TX 75225
940312890067
94031289
Bank One - Coppell TX
616 North Denton Tap Rd
Coppell, TX
Services: Observe placement of reinforcing for compliance with furnished drawings.
PROJECT DATA
Drawings Utilized: C-2, Paving Plan Details, dated 06/06/03
Locations/Items Observed: Sidewalk along W side ofjobsite including Wheelchair Ramp, Curb, Gutter and Leaveout
at SE side ofjobsite
Test Method: Visual Observation
REPORT OF OBSERVATION
ITEMS OBSERVBD CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVES CORRECT iNCORRECT
Placing Drawings Approved X Length and Shape X column Tie Spacing & Type
,ar Size X Proper Placement X stirrup Spacing & Type
~ar Grand X Properly Tied X
Rebar Clean X Dowel Bars in Place X Welded Splices
Faire C~ean X Proper Supports X Mechanical Splices
Number of Bars X Proper Cover X Lapped Splices X
Discrepancies/Comments: Any discrepancies found were corrected at the time of this observation unless otherwise
noted.
Field Results Report To:
Technician: ]VI_. Puente
Report Distribution:
(1) Bank One Texas NA
(1) City of Coppell TX
(1) Aguirre Building Systems
(1) City of Coppell TX
'll'erracrm
Hu~ad, P E.
Senior Project Manager
3095ks This report ~s e×cius~vely for the use of the client indicated above and shall not be reproduced without wdtten approval of HBCr'erracon