Loading...
Bank One-LR031015REPORT OF REINFORCING STEEL OBSERVATION 8901 Carpenter Frwy , Suite #100 Date of Service: 10/15/03 Report No.: Client No.: 17776 Project No.: Client: Bank One Texas NA Project: 8111 Preston Suite 250 Dallas, TX 75225 940312890067 94031289 Bank One - Coppell TX 616 North Denton Tap Rd Coppell, TX Services: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Drawings Utilized: C-2, Paving Plan Details, dated 06/06/03 Locations/Items Observed: Sidewalk along W side ofjobsite including Wheelchair Ramp, Curb, Gutter and Leaveout at SE side ofjobsite Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVBD CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVES CORRECT iNCORRECT Placing Drawings Approved X Length and Shape X column Tie Spacing & Type ,ar Size X Proper Placement X stirrup Spacing & Type ~ar Grand X Properly Tied X Rebar Clean X Dowel Bars in Place X Welded Splices Faire C~ean X Proper Supports X Mechanical Splices Number of Bars X Proper Cover X Lapped Splices X Discrepancies/Comments: Any discrepancies found were corrected at the time of this observation unless otherwise noted. Field Results Report To: Technician: ]VI_. Puente Report Distribution: (1) Bank One Texas NA (1) City of Coppell TX (1) Aguirre Building Systems (1) City of Coppell TX 'll'erracrm Hu~ad, P E. Senior Project Manager 3095ks This report ~s e×cius~vely for the use of the client indicated above and shall not be reproduced without wdtten approval of HBCr'erracon