Bank One-LR031009MORTAR COMPRESSIVE STRENGTH TEST Report Number: 94031289.0063 Service Date: October 1, 2003 'lFerr can 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Bank One Texas NA Attn: Danny Buckner 8111 Preston Suite 250 Dallas TX 75225 Report Date: October 09, 2003 Project: Bank One - Coppell TX 616 North Denton Tap Rd Coppell, TX Project Number: 94031289 Contractor: Mortar Supplier: Plant: On-Site Specification Requirements: Strength: 1800 psi @ 28 Days Test Methods: ASTM C109 ASTM C270 PROJECT DATA Mortar Mix I.D.: Type S Placement Date: 10/01/2003 Batch Time: 10:05am Time Sampled: 10:15am By: Joseph B. Gordon Weather Conditions: Clear Temperature (F)- Air 73 °F Mortar: 79 °F Truck No: Ticket No: Sample Size: 2 x 2 x 2 Sample Location: Course 28 Placement Location: Line A from 2 to 4 courses 25-35 Cube Marked - Set No, 1 REPORT OF TESTS Measured Measured Maximum Compressive Slump Flow Date Age Load Strength (inches) (seconds) Tested (days) (lbs. force) (psi) 10/08/2003 7 13040 3,260 1 2 10/29/2003 28 1 3 10/29/2003 28 Sen/ices- Obtain a sample of masonry mortar used during construction and cast 2 inch cube specimens for compressive strength determination. Technician: Joseph B. Gordon Report Distribution: (1) Bank One Texas NA (1) City of Coppe[I TX (1) Aguirre Building Syslems (1) City of Coppe[I TX Reviewed by: HBC/Terracon Hussein H Abusaad, P.E. Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or ider~tical materials Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94031289.0039 Service Date: September 10, 2003 'lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Bank One Texas NA Attn: Danny Buckaer 8111 Preston Suite 250 Dallas TX 75225 Report Date: October 09, 2003 Project: Bank One - Coppell TX 616 North Denton Tap Rd Coppell, TX Project Number: 94031289 Material Information Specified Strength: 3000 psi @ 28 Bays Batch Time: 3:27am Supplier: LBJ Concree Truck No: 737 Ticket No: 50214 Mix I.D. No.: 50 Water Added Onsite Before Test: 10 Gallons Water Added Onsite After Test: 0 Gallons Field Test Data Test Result Slump, inches: 5.75 Air Content, %: 1.2 Concrete Temperature,° F: 84 Ambient Temperature, o F: 80 Plastic Unit Weight, pcf: Laboratory Test Data Sample Information sample Time: 4:38am Date Cast: September 10, 2003 Technician: Joseph B. Gordon Weather Conditions: Clear Accumulative Yards: 80 Placement Method: Pump Sample Locations: Slab-on-grade C.5/2.5 Placement Location: Building slab-on-grade, A-F/l-8 Specification Test Method 3-5 ASTM C-143 N/A ASTM C-231 ASTM C-1064 ASTM C-1064 Set Specimen Diameter Area Date No. ID (inches) (sq. inches) Tested 1 1 6.00 28.27 0911712003 I 2 6.00 28.27 09/17~2003 1 3 6.00 28.27 10/08/2003 1 4 6.00 28.27 10108/2003 Age at Maximum Compressive Test Load Strength (days) (lbs) (psi) 7 117,870 4,170 7 117,380 4,150 Average 4,160 28 133,460 4,720 28 134,490 4,760 Average 4,740 Comments: Not tested for plastic unit weight. Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Joseph B. Gordon Report Distribution: (1) Bank One Texas NA (1) City of Coppell TX (1) Aguirre Building Systems (1) City of Coppell TX Reviewed by: HBC/Terracon Senior Project Manager The tests were performed in general accordance with ap¢icable ASTM, AASHTO, or DOT test meth°ds This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 940312890037 Service Date: September 9, 2003 'lrerracan 8901 Carpenter Frwy, Ste ¢100 Dallas, Texas 75247 (214) 630-1010 Client: Bank One Texas NA Attn: Danny Buckner 8111 Preston Suite 250 Dallas TX 75225 Report Date: October 09, 2003 Project: Bank One - Coppell TX 616 North Denton Tap Rd Coppell, TX Project Number: 94031289 Material Information Specified Strength: 3000 psi @ 28 Days Batch Time: Supplier: Truck No: Ticket No: Mix ID. No.: Water Added Onsite Before Test: 0 Gallons Water Added Onsite After Test: 0 Gallons Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature,° F: Ambient Temperature, o F: Plastic Unit Weight, pcf: LaboratorF Test Data Result 6.75 1.4 90 90 Set Specimen Diameter Area No. ID (inches) (sq. inches) 1 1 6.00 28.27 1 2 6.00 28.27 1 3 6.00 28.27 1 4 6.00 28.27 Sample Information Sample Time: 12:50pm Date Cast: September 9, 2003 Technician: Michael W. Whyman Weather Conditions: Clear Accumulative Yards: 10 Placement Method: Direct Discharge Sample Locations: See placement location Placement Location: Condenser Pad grade beam and slab-on-grade and pier caps @ 4D/4.1 Specification Test Method ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1064 Age at Maximum Compressive Date Test Load Strength Tested (days) (lbs) (psi) 09/16/2003 7 54,320 1,920 09/16/2003 7 52,030 1,840 Average 1,880 10~07~2003 28 74,910 2,650* 10/07/2003 28 75,080 2,650* Average 2,650 Comments: * Does not comply with specified strength. Not tested for plastic unit weight. Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Michael W. Whyman Report Distribution: (1) Bank One Texas NA (1) City of Coppell TX (1) Aguirre Building Systems (1) City of Coppell TX Reviewed by: HBC/Terracon Husse-i~ P.E. Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical Page 1 of 1