Loading...
Bank One-LR030925REPORT OF REINFORCING STEEL OBSERVATION 8901 Carpenter Frwy Suite #100 Date of Service: Client No.: Client: 09/25/03 Report No.: 17776 Project No.: Bank One Texas NA Project: 8111 Preston, Suite 250 Dallas, TX 75225 9403 ! 289.0066 94031289 Bank One - Coppell TX 616 North Denton Tap Rd Coppell, TX Services: Drawings Utilized: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA C2, dated 06/06/03 Locations/Items Observed: Paving, Entrance at Natches Trace Drive Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Discrepancies/Comments: The following discrepancies were noted and not corrected and at the time of this obse~wation. 1. Dowel bars needed to be added along construction joint with new site paving. Super- intendent was informed and repairs were started before technician left the site. Field Results Report To: Technician: M. Whyman Report Distribution: (1) Bank One Texas NA (1) City of Coppell TX (1) Aguirre Building Systems (1) City of Coppell TX 309sks Hu~saad, P. E. Senior Project Manager This repot[ is exclusively for [he use of the client indicated above and shaL[ not be reproduced without written approval of HBC/Terracon