Loading...
Bank One-LR030924 IBC REPORT OF REINFORCING STEEL OBSERVATION ]rerra¢on Date of Service: 09/24/03 Report No.: Client No.: 17776 Project No.: Client: Bank One Texas NA Project: 8it I Preston Suite 250 Dallas, TX 75225 94031289.0055 94031289 Bank One - Coppell TX 616 North Denton Tap Rd Coppell, TX Services: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Drawings Utilized: Approved 06/05/03, Page C-2, C-7 and General Note Locations/Items Observed: Paving from E of' building's SE co~-ner of' Nanches Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing DrawinGs Approved X Length and Shape X column Tie SpacJa§ & Type Discrepancies/Comments: The following discrepancies wei*c noted and not corrected at the time of this observadoR. I. Expansion joint did not extend to full depth of paving. Field Results Report To: Ken Tonnc Technician: B. Thomas Report Distribution: (1) Bank One Texas NA (1) City of Coppell TX (1) Aguirre Building Systems (1) City of Coppell TX 'll'erracan Husscin H. Abusaad, P. E. Senior Project IManager 309sks This report is exclusively for the use el the client m d~Caled aDOvo and shall r~ot b8 reproduced wit hotel written approval el HBC/Terracon