Loading...
Bank One-LR030918CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94031289.0039 Service Date: September 10, 2003 'lrerracan 8901 Carpenter Fn,vy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Bank One Texas NA Report Date: September 18, 2003 Attn: Danny Buckner Project: Bank One - Coppell TX 8111 Preston Suite 250 616 NoAh Denton Tap Rd Dallas TX 75225 Coppell, TX Project Number: 94031289 Material Information Specified Strength: 3000 psi @ 28 Days Batch Time: 3:27am Supplier: LBJ Concree Truck No: 737 Mix I.D. No.: 50 Water Added Onsite Before Test: 10 Gallons Water Added Onsite After Test: 0 Gallons Field Test Data Test Result Slump, inches: 5.75 Air Content, %: 1.2 Concrete Temperature,O p: 84 Ambient Temperature, o F: 80 Plastic Unit Weight, pcf: Laboratory Test Data Ticket No: 50214 Sample Information sample Time: 4:38am Date Cast: September 10, 2003 Technician: Joseph B. Gordon Weather Conditions: Clear Accumulative Yards: 80 Placement Method: Pump Sample Locations: Slab-on-grade C.5/2.5 Placement Location: Building slab-on-grade, A-F/l-8 Specification Test Method 3-5 ASTM C-143 N/A ASTM C-231 ASTM C-1064 ASTM C-1064 Age at Maximum Compressive Set Specimen Diameter Area Date Test Load Strength No. ID (inches) (sq. inches) Tested (days) (lbs) (psi) 1 1 6.00 28.27 09/17/2003 7 117,870 4,170 1 2 6.00 28.27 09/17/2003 7 117,380 4,150 Average 4,'160 1 3 10~08/2003 28 1 4 10/08~2003 28 Comments: Not tested for plastic unit weight, Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Joseph B, Gordon Report Distribution: (1) Bank One Texas NA (1) City of Coppe~l TX (1) Agui[re Building Systems (1) City of Coppell TX Reviewed by: HBC/Terracon Hus,~ P.E. Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods This report is exclusively for the use of the client indicated above and shalJ not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. LABORATORY COMPACTION CHARACTERISTICS OF SOIL Report Number: 94031289.0043 Service Date: September 11,2003 'll'erracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Bank One Texas NA Attn: Danny Buckner 8111 Preston Suite 250 Dallas TX 75225 Report Date: September 18, 2003 Project: Bank One - Coppell TX 616 North Denton Tap Rd Coppell, TX Project Number: 94031289 Material Information Contractor: Source of Material: Stockpile Proposed Use: Flexible Base USCS: Sample Information Sampled By: James C. Blackwell Sample Location: From stockpile delivered to jobsite Sample Description: Gray crushed limestone (flexible base) LaboratorF Test Data Test Procedure: Test Method: Sample Preparation: Rammer Type: ASTM D 698 Method C Moist Method Mechanical Maximum Dry Unit Weight, pcf: 127.3 Optimum Water Content, %: 5.5 Result Specifications Liquid Limit: 20 Plastic Limit: 15 Plasticity Index: 5 % Passing #200: % Passing #40: Moisture Density Relations Zero Air Voids Cur~e for assumed specific gravity 265 Services- Moisture-Density Relations Technician: James C. Blackwell Report Distribution: (1) Bank One Texas NA Reviewed by: Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative o11he properties of other apparently similar or identical materials REPORT OF REINFORCING STEEL OBSERVATION lrerracan Date of Service: Client No,: Client: 09/18/03 17776 Bank One Texas NA 81 ti Preston Suite 250 DalIas, TX 75225 Report No.: Project No.: Project: 9403 i289.0046 94031289 Bank One - Coppell TX 616 North Denton Tap Rd Coppell, TX Services: Drawings Utilized: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA C2 Legend, dated 06/06/03 Locations/Items Observed: Paving, E side, Drive-thru and Approach Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT iNCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Discrepancies/Comments: The following discrepancies were corrected at the time of this observation. 1. Reinforcing steel bars were not tied properly at thc NE and NW corners at the fire hme tie-in. 2. Chairs would be phtced prior to concrete placement. Field Results Report To: Technician: J. A[nip Report Distribution: (1) Bank One Texas NA (1) City el Coppell TX (1) Aguirre Building Systems (1) City of Coppell TX lr'erracan Hussein H. Abusaad, P. E. Senior Project Manager 309sks Th,s report is exclusively tot the use el the cliem ,ndicated above ~nd shaLL not be reproduced without written approval el HBC/Ter racon