Loading...
Bank One-LR030916CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94031289.0037 Service Date: September 9, 2003 'lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (2~ 4) 630-1010 Client: Bank One Texas NA Attn: Danny Buckner 8111 Preston Suite 250 Dallas TX 75225 Report Date: September 16, 2003 Project: Bank One - Coppell TX 616 Nodh Denton Tap Rd Coppell, TX Project Number: 94031289 Material Information Specified Strength: 3000 psi ~ 28 Days Batch Time: Supplier: Truck No: Mix I.D. No.: Water Added Onsite Before Test: Water Added Onsite After Test: Ticket No: 0 Gallons 0 Gallons Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, o F: Ambient Temperature, o F: Plastic Unit Weight, pcf: Laboratory Test Data Sample Information Sample Time: 12:50pm Date Cast: September 9, 2003 Technician: Michael W. Whyman Weather Conditions: Clear Accumulative Yards: 10 Placement Method: Direct Discharge Sample Locations: See placement location Placement Location: Condenser Pad grade beam and slab-on-grade and pier caps @ 4D/4.1 Result Specification Test Method 6.75 ASTM C-143 1.4 ASTM C-231 90 ASTM C-1064 90 ASTM C-1064 Age at Maximum Compressive Set Specimen Diameter Area Date Test Load Strength No. ID (inches) (sq. inches) Tested (days) (lbs) (psi) 1 1 6.00 28.27 09/16/2003 7 54,320 1,920 1 2 6.00 28.27 09/16/2003 7 52,030 1,840 Average t ,880 1 3 10/07/2003 28 1 4 10/07/2003 28 Comments: Not tested for plastic unit weight, Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Michael W. Whyman Report Distribution: (1) Sank One Texas NA (1) City of Coppell TX (1) Aguirre Building Systems (1) City of Coppe[I TX Reviewed by: acon Hussein H. Abusaad, PE. Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test meth°ds This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon Test results tr-nsmitted herein are only applicabte to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently simitar or identical materials CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94031289.0021 Service Date: August 18, 2003 'lrerracan 8901 Carpenter Fn~vy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Bank One Texas NA Attn: Danny Buckner 8111 Preston Suite 250 Dallas TX 75225 Report Date: September 16, 2003 Project: Bank One - Coppell TX 616 North Denton Tap Rd Coppell, TX Project Number: 94031289 Material Information Specified Strength: 3600 psi ~ 28 Days Batch Time: 8:18am Plant: 02 Supplier: LDJ Ready Mix Truck No: 731 Mix I.D. No.: 50 Water Added Onsite Before Test: 5 Gallons Water Added Onsite After Test: 0 Gallons Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, o F: Ambient Temperature, ° F: Plastic Unit Weight, pcf: LaboratorV Test Data Ticket No: 34767 Result 7.75 1.6 93 91 Sample Information Sample Time: 9:45am Date Cast: August 18, 2003 Technician: Wesley A. Lawson Weather Conditions: Sunny, hot Accumulative Yards: 2 Placement Method: Direct Discharge Sample Locations: Pier 6 Placement Lgcation: Piers 18, 6, 4, 19 Specification Test Method Set Specimen Diameter Area Date No. ID (inches) (sq. inches) Tested 1 1 6.00 28.27 08/25/2003 1 2 6.00 28.27 08/25/2003 1 3 6.00 28.27 09/15/2003 I 4 6.00 28.27 09/15/2003 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1064 Age at Maximum Compressive Test Load Strength (days) (lbs) (psi) 7 74,490 2,630 7 73,060 2,580 Average 2,610 28 101,960 3,610 28 102,800 3,640 Average 3,630 Comments: Not tested for plastic unit weight, Sen/ices - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Wesley A. Lawson Report Distribution: (1) Bank One Texas NA (1) City of Coppefl TX (1) Aguirre Building Systems (1) City of Coppell TX Reviewed by: HBC/Terracon Huss~ad, P.E. Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar er identical materials Page 1 of 1