Bank One-LR030911REPORT OF DRILLED PIER OBSERVATION
Report Number: 94031289.0032
Service Date: September 5, 2003
ll'erracon
8901 Carpenter Frwy, Ste #100
Dallas, Texas 75247
(214) 630-1010
Client: Bank One Texas NA
Attn: Danny Buckner
8111 Preston Suite 250
Dallas TX 75225
Report Date: September 11,2003
Project: Bank One - Coppell TX
616 No~lh Denton Tap Rd
Coppell, TX
Project Number: 94031289
Services: Drilled pier observation.
On this date, HBC/Terracon's technician arrived at the above referenced jobsite as scheduled for
drilled pier observation. See the attached sheet for recorded data.
Technician: Melvin L. Seades
Report Distribution:
(1) Bank One Texas NA
(1) Ci[y of Coppell TX
(1) Aguirre Bui~din9 Systems
(1) City of Coppell TX
Reviewed by:
HBC/Terracon
H~aad, PE
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods This report is exclusive}y for the use of the client
indicated above and shall not be reproduced except in full without the written approval of Terracon Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials
Page 1 of 1