Loading...
Bank One-LR030911REPORT OF DRILLED PIER OBSERVATION Report Number: 94031289.0032 Service Date: September 5, 2003 ll'erracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Bank One Texas NA Attn: Danny Buckner 8111 Preston Suite 250 Dallas TX 75225 Report Date: September 11,2003 Project: Bank One - Coppell TX 616 No~lh Denton Tap Rd Coppell, TX Project Number: 94031289 Services: Drilled pier observation. On this date, HBC/Terracon's technician arrived at the above referenced jobsite as scheduled for drilled pier observation. See the attached sheet for recorded data. Technician: Melvin L. Seades Report Distribution: (1) Bank One Texas NA (1) Ci[y of Coppell TX (1) Aguirre Bui~din9 Systems (1) City of Coppell TX Reviewed by: HBC/Terracon H~aad, PE Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods This report is exclusive}y for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials Page 1 of 1