Bank One-LR030910REPORT OF REINFORCING STEEL OBSERVATION 'lrerracon
Dallas, Texas 75247
Date of Service:
Client No.:
Client:
09/10/03
17776
Bank One Texas NA
8111 Preston Suite 250
Dallas, TX 75225
Report No.:
Project No.:
Project:
94031289.0041
9403 [ 289
Bank One - Coppell TX
616 North Denton Tap Rd
Coppell, TX
Services:
Drawings Utilized:
Observe placement of reinforcing for compliance with furnished drawings.
PROJECT DATA
Approved 06/05/03, Pages C2, C7
Locations/items Observed: W half of S drive, parking W of building & approach to Denton Tap
Test Method: Visual Observation
REPORT OF OBSERVATION
ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT
Placing Drawings Approved X Lenglh and Shape X Column Tie Spacing & Type
Bar Size X Proper Placement X Stirrup Spacing & Type
Bar Grade X. Propedy Tied X
Rebar Clean X Dowel Bars in Place X Welde0 Splices
Form Clean X Proper Supports X Mechanical Splices
Number of Bars X Proper Cover X Lapped Splices X
Discrepancies/Comments: The following discrepancies were noted and not corrected at the time of this observation.
1. No 4 1/2 inch metal sleeves were at the expansion joint.
2. An extra reinforcing bar was placed in top of the curb, not on prints.
Field Results Report To: Ken Tonne
Technician: B. Thomas
Report Distribution:
(1) Bank One Texas NA
(1) City of Coppell TX
(1) Aguirre Building Systems
(1) City of Coppell TX
'lrerracon
Hussein H. Abusaad, P. E.
Senior Project Manage
30911w This report is exc}usively for the use of the client ir~dicated above and shall not be reproduced without written approval of HaC/Terracon