Loading...
Bank One-LR030909REPORT OF REINFORCING STEEL OBSERVATION 'lrerracon Dallas, Texas 75247 Date of Service: Client No.: Client: 09/09/03 17776 Bank One Texas NA 8111 Preston Suite 250 Dallas, TX 75225 Report No.: Project No.: Project: 94031289.0036 94O31289 Bank One - Coppell TX 616 North Denton Tap Rd Coppell, TX Services: Drawings Utilized: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA S2.01 amd S3.01, dated 06/06/03 Locations/Items Observed: Condenser Pad, Grade Beam, Slab-on-Grade and Pier Cap D/4.1 Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT iTEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Length and Shape X Column Tie Spacing & Type Discrepancies/Comments: The discrepancies noted on Reinforcing Steel Observation Report #94031289.0035, dated 09/09/03 (earlier in the day) had been corrected. Any additional discrepancies found were corrected at the time of this observation unless otherwise noted. Field Results Report To: Technician: M. Whyman Report Distribution: (1) Bank One Texas NA (1) City of Coppell TX (1) Aguirre Building Systems (1) City of Coppell TX 30911w 'irerracon se~Q.. A/~ Hus busaad, P. E. Senior Project Manager This r epo*l is exclusively for the use of the clJerl[ indicated above and sha~ not be reproduced without written approval of HBC~erracon FIELD DENSITY TESTING Report Number: 94031289.0030 Service Date: September 4, 2003 'lrerracan 890t Carpenter FFN¥, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Bank One Texas NA Attn: Danny Buckner 8111 Preston Suite 250 Dallas TX 75225 Report Date: September 09, 2003 Project: Bank One - Coppeli TX 616 North Denton Tap Rd Coppell, TX Project Number: 94031289 Material Information Material Laboratory No, Test Method Description and Classification Lab Test Data Proiect Requirements Optimum Max, Lab Water Water Dry Unit Content Minimum Dry Content Weight Range Unit Weight (%) (pc0 (%) (% compaction) 1. 312890001 ASTM D 698 Tan & gray silty shaley clay w/sand Field Test Data Probe Test Lift/ Mat. Depth No. Test Location Elevation No. (inches) 10" PVC Storm Line 31 20' NE of SW inlet box 32 40' NE of SW inlet box 33 Retest of #31, dated 09/04/03 Datum: BEG = Below existing grade 15.3 107.5 -1/+3 95 Water Dry Unit Dry Unit Content Weight Weight (%) (pcf) (% compaction) 1.5' BEG 1 6 23.7 * 90.4 84 * Final 1 6 17.8 104.7 97 1 6 18.3 104.3 97 Comments: An asterisk (*) appears next to test results which do NOT meet the project specifications. Services - Perform in-place density and moisture content tests to determine degree of compaction and material moisture condition, Field Test Method;ASTM D2922, ASTM D3017 Gauge ID: 31787 Technician: Roy T. Montgomery Report Distribution: (1) Bank One Texas NA (1) City of Coppell TX (1) Aguirre Building Systems (1) City or Coppell TX Reviewed by: Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods, This report is exclusively for the use of the client indicated above and shaJl not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials Page 1 of 1 REPORT OF REINFORCING STEEL OBSERVATION lrerracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: Client No,; Client: 09/09/03 17776 Bank One Texas NA 811 l Preston Suite 250 Dallas, TX 75225 Report No.: Project No.: Project: 94031289.0035 94031289 Bank One - Coppell TX 616 North Denton Tap Rd Coppell, TX Services: Drawings Utilized: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Structural Locations/Items Observed: Condenser Pad, SE comer of building, Grade Beam and Pier Cap at line D/4.1 Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT iTEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Number et Bars X Proper C .... X Lapped Sp[i¢ss X Discrepancies/Comments: Discrepancies noted at the time of this obserwttion were reviewed with Kenny, the general contractor's representative, so the repairs would be completed prior to the reobservation to be performed prior to the concrete placement. Field Results Report To: Technician: R. Walker Report Distribution: (1) Bank One Texas NA (1) City of Coppell TX (1) Aguirre Building Systems (1) City of Coppell TX 30911w 'lrerracan Hussein H. Abusaad, P. E. Senior Project Manager This reporl is exclusively for the use of the client indicated above and shall not be reproduced wlthOul written approval of HBC,Terracon REPORT OF REINFORCING STEEL OBSERVATION ']rerfar'on Date of Service: 09/09/03 Report No.: Client No.: 17776 Project No.: Client: Bank One Te×as NA Project: 8111 Preston Suite 250 Dallas, TX 75225 94031289.0038 94031289 Bank One - Coppell TX 616 North Denton Tap Rd Coppell, TX Services: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Drawings Utilized: Structural, Sheet S2.01, Detail #l; and Sheet S.3.0 l, Details #l l, #12 and #13, dated 06/06/03. Locations/Items Observed: Floor Slab at lines A.3-E, 1 to 8 Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Length and Shape X Column Tie Spacing & Type X Bar Size X Proper Placemenl X Stirrup Spacing & Type X Bar Grade X Properly Tied X Rebar Clean X Dowel 8ars in Place X Welded Splices Form Clean X Proper Supporis X Meclnanlca[ Spllces Number of Bars Proper Cover X Lapped Splices X Discrepancies/Comments: Any discrepancies found were con'ected at the time of this observation unless otherwise noted. Field Results Report To: Technician: R. Montgomery Report Distribution: (1) Bank One Texas NA (1) City of Coppell TX (1) Aguirre Building Systems (1) City of Coppell TX 30911w lFerracun Hussein .~Abusaad, P. E. Senior Project Manager This repor~ is exclusively Ior the usa el the client indicated above and shall not be reproduced without written approval of HBC/Ferracon