Loading...
ST9304-CS 951017DALLAS COL qTY PUBLIC WORKS October 17, 1995 Mr. Thomas J. Knicker, P.E. Halff Associates, Inc. 8616 Northwest Plaza Drive Dallas, Texas 75225 Re: Belt Line Road -- Project No. 490-403.1/91-829 (Dentoa Tap Road to MacArthur Boulevard) Preliminary Paving and Drainage Area Review Dear Mr. Knicker: )S l 5 1995 ENGINEERING Attached are the preliminary paving plans and the drainage area map submitted for review. Please address all the comme~nts on the plans and in this letter. Several of the items listed were no corrected in the last submittal. Re-submittals to the County should include the original marked set of plans and should address the comments on the plans and in this letter. Please call me at 653-7151 if you have any questions concerning the project. Sincerely, · ~chment , xc: Ken Griffin, P.E., Assistant City Manager/City Engineer, City of Coppell 829/PAVREVS. LTR 411 Elm Street Dallas, Texas 75202 653-7151 Paving Comments 'r' , 8. 9. 10. 11. 12. 13. 14. 15. 10. 17. Title Sheet changes as marked. -Final locations for proposed benchmarks will be determined in the field and reflected on the appropriate paving and drainage plans. Property owners addresses, lot and block, volume and page of record need to be determined and shown on the paving and drainage plans and right-of-way documents. All existing drainage structures should be labeled either "to be removed", "to remain in use", or "to be plugged." Coppell has requested 4:1 slopes within their City. Additional field work is necessary at Northlake Drive and Riverside Church to reduce the proposed grade break at the tie-in points. Move inlet at Station 5+00 (right) west 10'. :; Add brick paver bands and notes as shown. Add TC elevation at inlet, paving Station 11 + 10. Coppeli to provide locations for conduit sleeves. Drainage and slope easement geometry to be established during drainage design. Need to submit revised cross section at Station 37+00.- Add Approximate Corporate Limit label. Sheets 11, 12. Use only 5', 10' and 14' inlets. Right-of-Way dimensions on the right-of-way plans. Label North Lake Road centerline P.I. Please note, both the Moore Road and Mockingbird Lane Intersections will be all brick. JMS:vjm 91-_x29: ,Pavm. g DRAINAGE COMMEN'tS , 6. 7. 8. 9. lO. ll. Y-inlets can pick up a maximum of approximately 20 cfs, and Special Y-inlets can pick up a maximum of approximately 40 cfs. Headwalls need to be provided where the run- off concentration exceeds 40 cfs. Resize inlet Station 5+ 18 left. Relocate proposed 14' inlet from Station 57+00, right to Station 55+25, right. Relocate proposed 14' inlet from Station 67+80, right to Station 66+50, right. and' resize. Resize inlet 68+24 righ/: Correct inlet Station labeling sheet 16, Station 77+00 or Station 78+00. Resize inlet Station 79+54.62, right. Resize inlet Station 91 +74.60, right. Minimum inlet size in a sag is 10'. Minimum inlet size in a sag is 10'. A Y-inlet is proposed at Station 91+74 left. This inlet will only pick up 1.24 cfs. Can this inlet bed eliminated and the 1.24 cfs diverted to the proposed Y-inlet at Station 99+00, left? Resize inlets Station 99+00, !eft and right. Y-inlet labeled at Station 117+00, right, is not shown on drainage area map. JMS:vjm 9 1 -~2~:',Dramage