Bank One-LR030815REPORT OF DRILLED PIER OBSERVATION Report Number: 94031289.0012 Service Date: August 11, 2003 'lferracan 5901 Carpenter Frwy, Ste #~00 Dallas, Texas 75247 (214) 630~1010 Client: Bank One Texas NA Attn: Danny Buckner 8111 Preston Suite 250 Dallas TX 75225 Report Date: August 15, 2003 Project: Bank One - Coppell TX 616 North Denton Tap Rd Coppell, TX Project Number: 94031289 Services: Drilled pier observation. On this date, HBC/Terracon's project manager arrived at the above referenced jobsite to observed the start of the pier drilling operations. Water, sand and gravel were encountered at approximately 14 feet below the surface during the drilling of the first pier. It was determined that casing would be required. A second pier was drilled at the northeast corner of the project. This pier was drilled successfully without the need for casing. Technician: Hussein H. Abusaad, P.E. Report Distribution: (1) Bank One Texas NA (1) City of Coppeil TX (1) Aguirre Building Systems (1) City of Coppell TX Reviewed by: Hussein H Abusaad, P.E. Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 REPORT Of DRILLED PIER OBSERVATION Report Number: 94031289.0010 Service Date: August 11, 2003 'lrerracan 8901 Carpenter Fn,vy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Bank One Texas NA Attn: Danny Buckner 8111 Preston Suite 250 Dallas TX 75225 Report Date: August 15, 2003 Project: Bank One - Coppell TX 616 North Denton Tap Rd Coppell, TX Project Number: 94031289 Services: Drilled pier observation. On this date, HBC/Terracon's technician arrived at the above referenced jobsite as scheduled for drilled pier observation. See the attached sheet(s) for recorded data. NOTE: Piers E/9 and C.9/8 were drilled but not concreted due to caving in. These pier holes will need to be cased. The contractor backfilled these pier holes and will complete them at a later date. Piers C/8 and E/1 were drilled but not completed due to caving in and the need of casing. These pier holes were also backfilled to be completed at a later date. Technician: Eddie A. EIrod Report Distribution: (1) Bank One Texas NA (1) City of Coppell TX (1) Aguirre Building Systems (1) City of Coppell TX Reviewed by: Hus~ein H, Abusaad, PE Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials Page 1 of t