Bank One-LR030725REPORT OF PRECONSTRUCTION MEETING
Report Number: 94031289.0002
Service Date: July 24, 2003
'lrerracan
8901 Carpenter Frwy, Ste #100
Dallas, Texas 75247
(214) 630~1010
Client: Bank One Texas NA
Attn: Danny Buckner
8111 Preston Suite 250
Dallas TX 75225
Report Date: July 25, 2003
Project: Bank One - Coppell TX
616 North Denton Tap Rd
Coppell, TX
Project Number: 94031289
Services: Preconstruction meeting.
As requested, HBC/Terracon's project manager for the above referenced project attended the
preconstruction meeting at the City of Coppell facilities. Construction materials testing and
observation services were among the issues discussed.
Technician: Hussein H. Abusaad, P.E.
Report Distribution:
(1) Bank One Texas NA
(1) City of Coppell TX
(1) Aguirre Building Systems
(1) City of Ceppell TX
Reviewed by:
C/Terracon
~H Abusaad, P.E.
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written approval of Terracon Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.