Loading...
Bank One-LR030725REPORT OF PRECONSTRUCTION MEETING Report Number: 94031289.0002 Service Date: July 24, 2003 'lrerracan 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630~1010 Client: Bank One Texas NA Attn: Danny Buckner 8111 Preston Suite 250 Dallas TX 75225 Report Date: July 25, 2003 Project: Bank One - Coppell TX 616 North Denton Tap Rd Coppell, TX Project Number: 94031289 Services: Preconstruction meeting. As requested, HBC/Terracon's project manager for the above referenced project attended the preconstruction meeting at the City of Coppell facilities. Construction materials testing and observation services were among the issues discussed. Technician: Hussein H. Abusaad, P.E. Report Distribution: (1) Bank One Texas NA (1) City of Coppell TX (1) Aguirre Building Systems (1) City of Ceppell TX Reviewed by: C/Terracon ~H Abusaad, P.E. Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.