Loading...
ST9902-CS030227INC. TEA GUE NA LL A ND PERKINS ENGINEERS · SURVEYORS · CONSULTANTS 1100 Macon Street, Fort Worth, Texas 76102 (817) 336-5773 (817) 336-2813 FAX MEMORANDUM To: From: Date: Re: Ken Griffin, P.E.-City of Coppell Mike Jones February 27, 2003 West Sandy Lake Road Project The following is a suggested agenda for our meeting tomorrow. Depending on how much time you will have to spend with us in the morning, it may be necessary to schedule a follow- up meeting to address all of these issues in detail. Please feel free to prioritize the items for tomorrow's meeting, as well as to add any additional items that from your perspective need to be discussed or clarified prior to us beginning the next phase of design. Su.qqested A.qenda for 8:30 a.m. Meetin.q w/City of Coppell Friday, February 28, 2003 Update Design Schedule a. Phase 1 - (Project ST 99-02 A) State Highway 121 to State Road i. Construction is anticipated to start in mid 2004 according to the City's website. ii. Complete Preliminary Design - August 1,2003 iii. Complete City Review - September 1,2003 iv. Complete Final Design - December 1,2003 v. Begin R/VV Acquisition - October 1, 2003 vi. Begin Utility Relocations - January 1,2004 b. Phase 2 - (Project ST 99-02 B) State Road to Denton Tap Road i. Construction is anticipated to start in mid 2007 according to the City's website ii. Complete Preliminary Design iii. Complete City Review iv. Complete Final Design v. Begin PAN Acquisition vi. Begin Utility Relocations II. Public Meeting? a. Date/Location b. Information/Exhibits Page 1 of 3 c. Format Discussion of Schematic Design Report and Plans - Phase I Issues a. Proposed Roadway Section: 6-Lane Divided; minimum r/w width-110 feet b. Proposed Pavement Section: 8-inch reinforced concrete pavement/8-inch lime stabilized subgrade c. Horizontal Alignment i. Limits of improvements (west end and east end) ii. Status of MIS for State Highway 121 iii.Proximity to north RNV line & TXU Overhead Transmission Towers iv. Transition from 6-lanes to 4-lanes and vice-versa d. Vertical Alignment e. Signalization i. Royal Lane? ~'~ ii. State Road? f. Survey of Outfall Drainage (north of W. Sandy Lake Road) g. Royal Lane i. Include construction of southbound lanes and divided median? ii. Median width h. Sidewalk Construction? i. Other City Review Comments IV. Discussion of Schematic Design Report and Plans - Phase 2 Issues a. Proposed Roadway Section: 4-Lane Divided; minimum r/w width-gO feet b. Proposed Pavement Section: 8-inch reinforced concrete pavementJ8-inch lime stabilized subgrade c. Horizontal Alignment i. Super-elevation/design speed 1. Coppell Road North a. w/super-elevation: 40-42 mph b. w/o: 35-37 mph 2. Coppell Road South a. w/super-elevation: 45-47 mph b. w/o: 40-42 mph ii. Conflict w/TXU Transmission Poles iii. Tree Preservation/Removal 1. 4-Lane Divided vs. 4-Lane Undivided iv. Bridge conflict w/24-Inch Water Line d. Vertical Alignment i. Retaining Walls ii. 24-Inch Water Line Adjustment iii.Lone Star Pipeline Adjustment e. Signalization i. Coppell Road North? ii. Coppell Road South? f. Sidewalk/Trail Construction? g. Other City Review Comments Page2of 3 V. Landscape/Streetscape Design VI. Supplemental Surveys VII. Updated Aerial/Topographic/GIS Information VIII. Utility Coordination Page 3 of 3