Loading...
ST9304-CS 950911DALLAS COUNTY PUBLIC WORKS September 11, 1995 Mr. Ken Griffin, P.E. Assistant City Manager/City Engineer City of Coppell 255 Parkway Boulevard Coppell, TX 75019 Belt Line Road -- Project No. 490-403.1 / 91-829 (Denton Tap Road to MacArthur Boulevard) Paving Grade Review Dear Mr. Griffin: Thank you for your comments on the last set of preliminary paving plans. Your comments have been forwarded to the consultant for incorporation in the revised plan set. Some of your comments are addressed below. If you have any questions about the County's responses, you may call me at 653-7151. Sincerely, j~\ABR\JMS 829~2',PAVEREV3.LTR 411 Elm Street Dallas, Texas 75202 653-7151 COUNTY'S RESPONSE TO 9/1/95 LETTER Ali Maelcouti with Dallas County Public Works I As discussed at the predesign conference, construction of tgy(mdu~s ' deals ~d specifications Br inclusion in the pl~ set ~d bid pachge. Conduits may also be included in this project at the request of the City. The City must provide the locations, sizes, and any details and specifications necessary for inclusion in the plan set and bid package. CoppeWs request for 4:1 slopes will be followed in the Coppell City Limits. The additional costs associated with such slopes will be the responsibility of the City of Coppell. 4&5. A geotechnical investigation and report were subcontracted by the consultant. The recommended geotechnical procedures will be followed in constructing the proposed embankment. /6. The inlet will be relocated. Raising Belt Line Road would not help the grade transition at the Mockingbird intersection. The consultant is reevaluating the proposed grades at Moore. The proposed railroad crossing details are attached. Please note that this crossing is in the City of Dallas. , The County requested the consultant to remove the toe-of-slope symbols where the proposed toe-of-slope is within the right-of-way and conforms with the typical section. 10. The Moore Road intersection is in the City of Dallas. If the City of Coppell wishes to provide the funding for constructing the brick pavers in the City of Dallas, the intersection will be constructed with the requested pavers. ll&13. According to Halff Associates and using their hydraulic models prepared for the City of Coppell, the 100-year flood elevation can be lowered to 459.50 feet at the upstream face of the bridge. Therefore, a revised low chord elevation of 461.50 was used to refine the pavement profile shown in the alignment study. 12. The consultant has been directed to evaluate the sight distance at the Northgate intersection. 14. Halff Associates recen~y completed a report for the City of Coppell regarding Grapevine Springs. No additional report will be prepared as a part of this contract. 15. Shifting the inlets, and subsequen~y the low points, further toward Belt Line Road will increase the severity of the grade transition that the City requested be modified in the previously noted item 7. 16. As correctly noted by the City the outfall is improperly shown. The consultant has been directed to correct this item. The consultant has been directed to clarify the drainage pattern for areas B3, C 1, C17, etc. The asterisk note questioned on the plan set shows that the drainage boundary only includes the area that can be adequately carried in the existing system.