Loading...
SS9901-CS031231 (2)CIP PROJECTS Pro. ieet No.: SS99-01 /._,~-6 ~. s/. ~> Project Name: Deforest & Sandy Lake Wastewater Lift Station & Force Main Imp. Engineer: Turner Collie & Bradcn, Inc. 1 st Review Review Process: Date: Comments: Received: 07-02-01 Preliminary Design Report 5 Copies Reviewed By: City Engineer '-~ ~0, CIP Coordinator Inspector O~er Re~ed to ~n~ineer: Review Procgssl Date: Comments: Received: Reviewed By: CiW F, ngineer CIP Coordimtor Inspector O~er Ret~ed to ~nsineer: Review Review Process: Date: Comments: Received: 7- ~ z-w ~;? ,: . ~ . ,. Reviewed By: City F, ngineer C~ Coor~nator ~spector Other Ret~ed to Engineer: CIP PROJECTS Project No.: SS99-01 t L,t~'~__~ a~ ¢ ~'~ Project Name: Deforest & Sandy Lake Wastewater Lift Station & Force Main Imp. Engineer: Turner Collie & Braden, Inc. 1 stReview Review Process: Dnte: Comments: Received: 07-02-01 Preliminary Design Report 5 Copies Reviewed By: City Engineer CIP Coordinator Inspector Other Returned to En[gineer: gga>,l~ Review Review Process: Date: Comments: Received: 12-21-01 Force Main - Line A-2 (30") & Line B (20") Reviewed By: City Engineer Asst. City Engineer C1P Coordinator Grad. Engineer i Other 12-26-01 I copy sent to Utilities Returned to Engineer: 6'r~~t Review Review Process: Date: Comments: Received: ~-IO-~Z. }~>~-- t to';-o IZl~_x~/t~l~,, ~~--, Reviewed By: City 12nglneer Asst. City Engineer CIP Coordinator Grad. Engineer Other Returned to Engineer: Developer; Revlewe~ By: ~ev[ew Date: Commente ;tacieved: Sent to Utilites/Stree~s: Reviewed By Lar~/Gatreth: Returned to Engineer: ~ ev/ew Date: Comments Sen~ to Utili~es/S~reets: Reviewed By Lar~/Gatreth: Returned to Engineer: ~ Date ' Commen~s Sene co Utilites/Scree[s: , Reviewed 8y Returned to E~inee~: Fees Paid: Water, Sewer. · Roadwa .Ine ec~ion Plans A~proved: Octet Comments