SS9901-CS031231 (2)CIP PROJECTS
Pro. ieet No.: SS99-01 /._,~-6 ~. s/. ~>
Project Name: Deforest & Sandy Lake Wastewater Lift Station & Force Main Imp.
Engineer: Turner Collie & Bradcn, Inc.
1 st Review
Review Process: Date: Comments:
Received: 07-02-01 Preliminary Design Report 5 Copies
Reviewed By:
City Engineer '-~ ~0,
CIP Coordinator
Inspector
O~er
Re~ed to ~n~ineer:
Review Procgssl Date: Comments:
Received:
Reviewed By:
CiW F, ngineer
CIP Coordimtor
Inspector
O~er
Ret~ed to ~nsineer:
Review
Review Process: Date: Comments:
Received: 7- ~ z-w ~;? ,: . ~ . ,.
Reviewed By:
City F, ngineer
C~ Coor~nator
~spector
Other
Ret~ed to Engineer:
CIP PROJECTS
Project No.: SS99-01 t L,t~'~__~ a~ ¢ ~'~
Project Name: Deforest & Sandy Lake Wastewater Lift Station & Force Main Imp.
Engineer: Turner Collie & Braden, Inc.
1 stReview
Review Process: Dnte: Comments:
Received: 07-02-01 Preliminary Design Report 5 Copies
Reviewed By:
City Engineer
CIP Coordinator
Inspector
Other
Returned to En[gineer:
gga>,l~ Review
Review Process: Date: Comments:
Received: 12-21-01 Force Main - Line A-2 (30") & Line B (20")
Reviewed By:
City Engineer
Asst. City Engineer
C1P Coordinator
Grad. Engineer
i Other 12-26-01 I copy sent to Utilities
Returned to Engineer:
6'r~~t Review
Review Process: Date: Comments:
Received: ~-IO-~Z. }~>~-- t to';-o IZl~_x~/t~l~,, ~~--,
Reviewed By:
City 12nglneer
Asst. City Engineer
CIP Coordinator
Grad. Engineer
Other
Returned to Engineer:
Developer;
Revlewe~ By:
~ev[ew
Date: Commente
;tacieved:
Sent to Utilites/Stree~s:
Reviewed By Lar~/Gatreth:
Returned to Engineer:
~ ev/ew
Date: Comments
Sen~ to Utili~es/S~reets:
Reviewed By Lar~/Gatreth:
Returned to Engineer:
~ Date ' Commen~s
Sene co Utilites/Scree[s:
, Reviewed 8y
Returned to E~inee~:
Fees Paid: Water, Sewer.
· Roadwa .Ine ec~ion
Plans A~proved:
Octet
Comments