SS9901-CS040113DEFOREST ROAD
LIFT STATION IMPROVEMENTS
DEFOREST & SANDY LAKE WASTEWATER LIFT STATIONS
BID TABULATION
Bids Opened: (Bid date not yet sst)
Engineer's Estimate
Item No. Description Unit Quantity Unit Price Total
1 Demolition of DeForest Lift Station LS 1 $72,324 $72,324
2 New DeForest Lift Station LS 1 $1,291,647 $1,291,647
3 DeForest Lift Station Yard Piping LS 1 $137,508 $137,508
4 DeForest Lift Station Trench Safety System LS 1 $2,426 $2,426
5 DeForest Lift Station Storm Water Controls LS 1 $4,158 $4,158
6 Demolition of Sandy Lake Lift Station LS $42,000 $42,000
7 New Sandy Lake Lift Station LS $529,967 $529,967
8 Sandy Lake Lift Station Yard Piping LS 1 $152,460 $152,460
9 Sandy Lake Lift Station Trench Safety System LS 1 $2,289 $2,289
10 Sandy Lake Lift Station Storm Water Controls LS 1 $4,232 $4,232
11 Line A Force Main Connection LS 1 $5,250 $5,250
12 Line B Force Main Connection LS 1 $14,490 $14,490
Total $2,258,700
City of Coppell Coppel Lift Stations-Bid Tabulation
DeForest and Sandy Lake Lift Stations Page 1 of 1 1/13/2004