Loading...
SS9901-CS040113DEFOREST ROAD LIFT STATION IMPROVEMENTS DEFOREST & SANDY LAKE WASTEWATER LIFT STATIONS BID TABULATION Bids Opened: (Bid date not yet sst) Engineer's Estimate Item No. Description Unit Quantity Unit Price Total 1 Demolition of DeForest Lift Station LS 1 $72,324 $72,324 2 New DeForest Lift Station LS 1 $1,291,647 $1,291,647 3 DeForest Lift Station Yard Piping LS 1 $137,508 $137,508 4 DeForest Lift Station Trench Safety System LS 1 $2,426 $2,426 5 DeForest Lift Station Storm Water Controls LS 1 $4,158 $4,158 6 Demolition of Sandy Lake Lift Station LS $42,000 $42,000 7 New Sandy Lake Lift Station LS $529,967 $529,967 8 Sandy Lake Lift Station Yard Piping LS 1 $152,460 $152,460 9 Sandy Lake Lift Station Trench Safety System LS 1 $2,289 $2,289 10 Sandy Lake Lift Station Storm Water Controls LS 1 $4,232 $4,232 11 Line A Force Main Connection LS 1 $5,250 $5,250 12 Line B Force Main Connection LS 1 $14,490 $14,490 Total $2,258,700 City of Coppell Coppel Lift Stations-Bid Tabulation DeForest and Sandy Lake Lift Stations Page 1 of 1 1/13/2004