June 19, 1995
Ms. Elizabeth Karahan
TU Electric - Northlake Plant
14901 Northlake Road
Coppell, Texas 75019
Re: Belt Line Road - Project #490- 403.1/91 -829
(Denton Tap Road to, MacArthur Boulevard)
Railroad Spur
Dear Ms. Karahan:
Dallas County has extensively researched the transactions between TU Electric (formerly
Dallas Power and Light) and the County regarding the original construction of Belt Line
Road and the railroad spur. On November 21, 1957, Dallas County granted DP &L
permission to construct the spur across Belt Line Road. In that agreement, DP &L is charged
with the responsibility for maintaining the railroad spur if DP &L desires to continue using
said spur. The preliminary estimate for reconstructing the spur is $53,100. A layout sheet
for the proposed spur is attached.
The hazard index for the railroad spur is extremely low due to the infrequent train traffic.
No AAS14TO or MUTCO warrant exists for an active traffic control device at the crossing.
The crossing will require passive signs and roadway markings.
Dallas County and the City of Coppell are currently reviewing the preliminary plans for the
Belt Line Road reconstruction. After the preliminary plans are approved; a copy of the plans
will be sent to you for your information. The current project schedule is as follows:
Complete Plans November, 1995
Begin Construction Mid, 1996
Complete Construction Fall, 1997
Project construction is subject to funding availability. The construction estimate is $4.2
million dollars and the project is currently showing a shortfall of over a million dollars.
411 Elm Street Dallas, Texas 75202 653 =7151
Ms. Elizabeth Karahan
June 9, 1995
Page 2
I may be reached at 653 -7151 if you have any questions regarding this project.
Sincerely,
ill M. hneberger, . E.
Project ngineer
JMS:'d'b
JJ
07 "rxc: Ken Griffin, P.E., City of Coppell
Attachments
829:\RALRDSPKLTR
WHUMAS Dallas Pawsr k Light Csapay has a*aitted a 8t. Luis S
304hwestera Railroad Csipuw drawing B showing the proposed spur track
erooming the Belt Line; and
liHSM- in tie censtrueation of the Borth Lake Electric Station,
Dallas Rorer k Lilit Ccmpup and the County Of Dallas entered into as agreement
.dth referoacs to the closing and re- routing reads in that vicinity and at that
tie the Dallas Power h Light Company donated certain rights of way and informed
Dallas County that this Railroad spur track would have to cross the Belt Liza
Road to serve the North Lake $leetric Station,
IT IS THIREFORB ORD = ADMMD ARID DBrRBm by the Commissioners Court
of Dallas County, Texas, that Dallas Power h Light Company is hereby granted
permisaion sad /or authority to construct and maintain a Railroad spur track across
the Belt Line Road to serve it 4 North Lake ELeetri#_9tatI azt -As
_ thQyp,-Szt tl
St. Louis Seuthwstera Railroad Camgmwy drawing R -2967.
Don! in open Court, all members present and toting.
7 L. Ste tt, unty J go
Lynn V. L , Coa.Dist.
il ly �
W.H. Csyle, .
doss ell, Coa. Out-M3
Denver Seals, Cam. Dist. jV4