Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Northlake WE P12-CR 900605
(:tTY I)[.' COPPEI.L DALLY INSPECTION REPORT ENGINEERING WEATllER 0~ 10'~ 20° 30~' CLD 50° RAIN 6(I° SNOW 70"> l ICE 80° 90° ) 100° WIND DEW SPEED POINT TRENCH OTIIER WORK DAY ~] NO ACTIVITY INSPECTOR: ~-~-~/~__