Loading...
Northlake WE P12-CR 900618 The City With A Beautiful Future UTILITY LIN£ INSPECTION AND TESTING Project: ~ ~ez~ /-¢¢~- ,~,r~',,'~ Date: /~, ~-~-2,~/ To Area: P.O. Box 478 CoppelI. Texas 75019 214 - 462-0022 Line ..ESS.RES MA..REL START FINISH Test per formed By:_ Inspected By: COMMENTS: /, ¢,v'~ Contractor: The City With A Beautiful Future UTILITY LINE INSPECTION AND TESTING R O. Box 478 Coppell, Texas 75019 214 - 462-0022 Project: x~_~ t_~4: ~,.4~¢~1~.,-~t,¢ '~ /2- Date: /,¢_To~ ~o Area: Line: Diameter: Length: Plan Sheet No PRESSURE TEST START Time: ~:z':,~ Pressure: /~ Allowable Leakage Per Day: (ll.&~ gpd) X [,0~ miles Gallons Lost Per Day: ( .~' Gal. Lost) Passed:.. ~~ FINISH Time: /:z¢ Pressure: of pipe) _ inch Diameter) Hrs. Tested) X 24 Hrs. = ~ , ~' Rejected: INFILTRATION/EXFILTRATION TEST START FINISH Time: Time: Allowable Leakage Per Day:_ (250 gpd) X ( miles Gallons Lost Per Day: ( Gal. Lost) ~ ( Passed: COIV~IENTS: of pipe).X ( Hrs. Tested) Rejected inch Diameter) X 24 Hrs. = Tested Performed By: Passed or Rejected By: